answersLogoWhite

0


Best Answer

To reach the summit of Mount Everest can take anywhere between 4 to 8 weeks. You have to allow time for your body to acclimatize to the high altitude, then you must wait for the right weather window to allow you to climb to the summit and back safely.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

9y ago

To reach the summit of Mount Everest can take anywhere between 4 to 8 weeks. You have to allow time for your body to acclimatize to the high altitude by climbing high then descending low, then you must wait for the right weather window to allow you to climb to the summit and back safely.

This answer is:
User Avatar

User Avatar

Wiki User

11y ago

It can take anything up to about 30 days to reach the summit from Base Camp. You climb to different camps, sleep there and then come back down before going up to the next camp. You repeat this to acclimatize.

This answer is:
User Avatar

User Avatar

Wiki User

9y ago

To get to Mount Everest from England you would need to fly to Kathmandu then take a plane from there to Lukla. From here you would have to trek/walk to Base Camp.

This answer is:
User Avatar

User Avatar

Wiki User

11y ago

You cant, there is a mysterious force field around the mountain. It starts approximately three quarters of the way up .

This answer is:
User Avatar

User Avatar

Wiki User

11y ago

a long time

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How long does it take to get to Mount Everest from Britain?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How long does mount Everest take to erupt?

Mount Everest does not erupt as it is not a volcano.


How long did it take for George Everest to reach the top of Mt. Everest?

George Everest never climbed Mount Everest, he was the Surveyor General of India.


How long did it take for Edmund Hillary to climb Mount Everest?

Edmund Hillary and Tenzig Norgay climbed Mount Everest in 7 weeks in 1953


How long does it take to get to Mount Everest?

To reach the South (Nepal) side of Mount Everest takes around 14 days from Kathmandu. To reach the North (Tibet) side of Mount Everest takes around 10 days.


How long would it take to climb up mount Everest?

At least two weeks.


How long did it take Sir Edmund Hillary to descend Mount Everest?

7 weeks


how long does it take to climb mount everest?

it takes about 2 months in the best conditions


Is there water on mount Everest?

Expeditions on Mount Everest do not take any water with them. They melt the snow and ice that is on the mountain to use as there water.


How long did it take dawson stelfox to climb mount Everest?

Dawson Stelfox was 35 when he reached the summit of Mount Everest on the 7th October 1993.


Why does it take so long to reach the summit of mount Everest?

limited oxygen and steep sides


How many breaths does a person take on top of mount Everest?

people take about 5 breaths on mount everest


Why do people take such a long time to climb mount Everest?

because it takes 7 weeks to get to the top of the Mt Everest and 3 days to get down.