11 cubic yards of planting mix converted to how many tons?
A cubic foot of dirt is about 100 pounds. To fill a ton, 20 would be needed, but to fill a cubic yard, 27 would be needed. As such, a ton of dirt would only fill about .74 cubic yards.
it would depend on the moisture content.
calculated off the 40 pound bags you get at your local store it would be just under 1 cubic yard.
1
8 metric tons is 8.818 US tons.
8 yards are in 24 feet24 feet = 8 yards24 feet is 8 yards.
There are 2000 pounds in one ton. Therefore, 8 tons is equal to 8 x 2000 = 16000 pounds.8 short tons in lbs is 16000.
5/8 mile is 1,100 yards.
14080 yds
35/9 cubic yards for every foot deep.
16 tons of dry sand occupies approximately 320 cubic feet of volume.
approximately 2.7
An 8-foot wide by 90-foot long by 8-inch depth requires a minimum of 2,565.5 cubic yards (22.8 tons) of gravel.
8 metric tons is 8.818 US tons.
How many what? 8 yards is 24 feet. 8 yards is also 288 inches.
A yard of dirt is 3ft x 3ft x 3ft, or 27 cubic ft. The hole you need to fill is 8ft x 4ft x 1ft, or 32 cubic ft. You'll need 32/27th yards of dirt, or about 1.19 yards of dirt. Call it a yard and a half if you want to account for settling.
8 yards = 288 inches, since there are 36 inches in a yard.
16000 pound in 8 US tons 17920 pound in 8 UK tons
8 yards = 7.3152 meters
8 yards = 7.3152 metres
8 yards is 288 inches.