Ashtead railway station

Share on Facebook Share on Twitter Email
Wikipedia on Answers.com:

Ashtead railway station

Top
Ashtead National Rail
Ashtead
Ticket office building on the Down platform
Location
Place Ashtead
Local authority Mole Valley
Operations
Station code AHD
Managed by Southern
Number of platforms 2
Live arrivals/departures and station information
from National Rail Enquiries
Annual rail passenger usage
2004/05 *  0.830 million
2005/06 * increase0.874 million
2006/07 * increase0.925 million
2007/08 * increase1.036 million
2008/09 * increase1.050 million
2009/10 * increase1.056 million
2010/11 * increase1.095 million
History
Opened 1 February 1859 (1 February 1859)
National Rail - UK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Ashtead from Office of Rail Regulation statistics. Please note: methodology may vary year on year.

Ashtead railway station is a railway station serving the village of Ashtead in Surrey.

Contents

History

Designed by David Field in 1858 and opened by the Epsom and Leatherhead Railway, A part of the London and South Western Railway, it became a joint station between that railway and the London, Brighton and South Coast Railway and so was absorbed into the Southern Railway during the Grouping of 1923. The station then passed to the Southern Region of British Railways on nationalisation in 1948.

When Sectorisation was introduced in the 1980s, the station was served by Network SouthEast until the Privatisation of British Railways.

For many years, the sign on one platform read "Ashtead" while the other read "Ashstead".[citation needed]

Typical off-peak journey times from Ashtead

Based on the December 2006 - May 2007 timetable
Frequency in trains per hour

Destination Platform Journey time Frequency Operator
Epsom 1 4 minutes 6 tph Southern and South West Trains
Sutton 1 14 minutes 2 tph Southern
Wimbledon 1 25 minutes 4 tph South West Trains
Clapham Junction 1 28 minutes 6 tph Southern and South West Trains
LONDON VICTORIA 1 38 minutes 2 tph Southern
LONDON WATERLOO 1 40 minutes 4 tph South West Trains
Leatherhead 2 4 minutes 6 tph Southern and South West Trains
Dorking 2 10 minutes 4 tph Southern and South West Trains
HORSHAM 2 31 minutes 1 tph Southern
Effingham Junction 2 13 minutes 2 tph South West Trains
GUILDFORD 2 23 minutes 2 tph South West Trains

References

External links

Preceding station National Rail National Rail Following station
Epsom   Southern
Sutton & Mole Valley Line
  Leatherhead
Epsom   South West Trains
Mole Valley Line
  Leatherhead

Coordinates: 51°19′05″N 0°18′29″W / 51.318°N 0.308°W / 51.318; -0.308



Post a question - any question - to the WikiAnswers community:

Copyrights:

Mentioned in