Share on Facebook Share on Twitter Email
Answers.com

Bala and Festiniog Railway

 
Wikipedia: Bala and Festiniog Railway
 v  d  e Bala and Festiniog Railway
Conwy Valley Line 
Continuation backward
 to Llandudno
 
Unknown route-map component "eBHF"
 Blaenau Festiniog (LNWR)
 
Straight track
 Trawsfynydd Link
Ffestiniog Railway 
Unknown route-map component "uCONTr" Unknown route-map component "uCPICKl" Unknown route-map component "xCPICre"
 Blaenau Festiniog (GWR)
 
Unknown route-map component "exBHF"
 Manod
 
Unknown route-map component "exHST"
 Cwm Teigl Halt
 
Unknown route-map component "exBHF"
 Llan Ffestiniog
 
Unknown route-map component "exBHF"
 Maentwrog Road
 
Unknown route-map component "exDST"
 Power station loading point
 
Unknown route-map component "exHST"
 Trawsfynydd Lake Halt
 
Unknown route-map component "exBHF"
 Trawsfynydd
 
Unknown route-map component "exHST"
 Llafar Halt
 
Unknown route-map component "exHST"
 Bryn-Celynog Halt
 
Unknown route-map component "exBHF"
 Cwm Prysor
 
Unknown route-map component "exBHF"
 Arenig
 
Unknown route-map component "exHST"
 Capel Celyn Halt
 
Water from down to right Unknown route-map component "tWSTR"
 
Section flooded 
Water Unknown route-map component "exLUECKE"
 
by Llyn Celyn 
Water Unknown route-map component "exLUECKE"
 
 
Water Unknown route-map component "extHST"
 Tyddyn Bridge Halt
 
Water from right and up Unknown route-map component "tWSTR"
 
 
Unknown route-map component "exBHF"
 Frongoch
 
Transverse water Water from down to left Unknown route-map component "exSTR"
 
Bala Lake 
Water Unknown route-map component "exBHF"
 Bala (New)
 
Transverse water Water from left and up Unknown route-map component "exSTR"
 
Bala Lake Railway  
Unknown route-map component "exABZfg" Unknown route-map component "exBHFq" Unknown route-map component "exCONTl"
 Bala Junction
Bala Lake Halt 
Continuation to left Unknown route-map component "KBHFxr" Unknown route-map component "exSTRrf"
  Ruabon to Barmouth Line
now Bala (Llyn Tegid) 
 
(former Barmouth line)  
 

The Bala and Ffestiniog Railway was a 4 ft 8+12 in (1,435 mm), standard gauge, railway backed by the Great Western Railway (GWR)[1] railway in North Wales which connected Bala with Blaenau Ffestiniog.

Contents

History

The railway originally connected Bala with Llan Ffestiniog and was incorporated on 28 July 1873, and opened on 1 November 1882.[1] In 1883 the line was extended by converting the existing Festiniog and Blaenau Railway between Llan Ffestiniog and Blaenau Ffestiniog from 1 ft 11+12 in (597 mm) gauge to 4 ft 8+12 in (1,435 mm) standard gauge. The line terminated at Blaenau Ffestiniog (GWR) where until 1939 it connected with the Ffestiniog Railway to Porthmadog. At Bala Junction the line connected with the Ruabon Barmouth GWR line.

The line closed to passengers in 1960 and to freight in 1961. An unusual feature of freight operation on the line was the carriage of 1 ft 11+12 in (597 mm) gauge slate wagons (provided by the GWR) on standard gauge transporter wagons between Manod and Blaenau Ffestiniog where the wagons were off-loaded in the large station yard and their loads of dressed slate transferred to standard gauge GWR wagons for onward carriage via Manod and Bala.

The building of the Llyn Celyn reservoir necessitated the flooding of the line. A diversion was considered but never built. A short section from Bala Junction to Bala remained opened but was eventually closed in 1965.

The summit of the line was at Cwm Prysor which lay at 1,278 feet/390 metres above sea level. The line served an extremely remote area of North Wales, most of which was not served by a main road until the A4212 road opened in the early 1960s.

In 1964, a connection was made through Blaenau to the Conwy Valley Line at Blaenau Ffestiniog North allowing access as far as the nuclear power station at Trawsfynydd; a loading facility for nuclear flasks was constructed a hundred yards north of the closed Trawsfynydd Lake Halt.

In 1982, the connection with the Ffestiniog Railway at Blaneau Ffestiniog Central (GWR) was re-established, the station was re-opened to passenger traffic, and Blaneau Ffestiniog North (LNWR) was closed.

Current status

The only part of the line in use today is the very short section between the two stations in Blaneau Ffestiniog. The section of line between Blaenau and Trawsfynydd power station closed in 1998, although the track has remained in situ for several years. Much of the trackbed remains intact except for the section flooded by Llyn Celyn and some sections used to improve the A4212 road. Several other sections are open as permissive paths.

Many of the former stations are now in use as private residences.

References

Notes

  1. ^ a b Awdry (1990); p15

Sources


Search unanswered questions...
Enter a question here...
Search: All sources Community Q&A Reference topics
 
 

 

Copyrights:

Wikipedia. This article is licensed under the Creative Commons Attribution/Share-Alike License. It uses material from the Wikipedia article "Bala and Festiniog Railway" Read more