The Baltic Gas Interconnector was a project of the natural gas submarine pipeline between Germany, Denmark and Sweden. The pipeline would connect the existing pipeline networks of southern Scandinavian and Continental European countries in order to secure uninterrupted supply of natural gas.[1]In Germany, landfall of the pipeline was to be in Rostock area. The German onshore section was to include a compressor station and a connection to the existing gas network. The length of planned offshore section was around 200 kilometres (120 mi). The Danish landing point was to be in Avedøre, and the pipeline was planned to connect with the Avedøre power plant. In Sweden, the landing point was to be in Trelleborg and the Swedish onshore section was to continue approximately 20 kilometres (12 mi) to the existing gas grid.

Contents

Technical features

The pipeline was designed for a pressure of 150 bar (15 MPa) with a diameter of 28 to 32 inches (710 to 810 mm). The planned annual capacity was 3 billion cubic meter (bcm). The consortium to build the Baltic Gas Interconnector consisted of DONG Energy (originally Energi E2), Hovedstadsregionens Naturgas (HNG), Verbundsnetz Gas AG (VNG), E.ON Sverige AB, Göteborgs Energi, Lunds Energi and Öresundskraft.[1]

Feasibility study

The feasibility study which was completed in 2001 included market assessment, seabed survey, offshore and onshore installations estimated total cost to be €225 million ($202.3 million). The pipeline was scheduled to become operational circa 2004-2005. [2] Environmental impact assessment started in 2002. Authorization from Swedish government was given in 2004, by Denmark - in 2005. The last phase of authorization was to come from Germany, in 2006. The project has not been implemented yet.

During the initial stages of the project, gas was planned to transported from the North Sea which is now in depletion. Consequently, Russian gas has been considered as an alternative source for the pipeline. However, due to considerations for linking Nord Stream pipeline to Swedish pipeline network, implementation of BGI is being revisited. [3]

References

External links


Search unanswered questions...
Enter a question here...
Search: All sources Community Q&A Reference topics
 
 

 

Copyrights:

Wikipedia. This article is licensed under the Creative Commons Attribution/Share-Alike License. It uses material from the Wikipedia article "Baltic Gas Interconnector" Read more