Share on Facebook Share on Twitter Email
Answers.com

British Rail Class 52

 
Wikipedia: British Rail Class 52
British Rail Class 52
D1000-old oak common - 1964.jpg
D1000 Western Enterprise at Old Oak Common, desert sand livery, 1964
Power type Diesel-hydraulic
Builder British RailwaysSwindon and Crewe Works
Configuration C-C
UIC classification C'C'
Gauge 4 ft 8+12 in (1,435 mm) standard gauge
Wheel diameter 3 ft 7 in (1.092 m)
Minimum curve 4.5 chains (91 m)
Wheelbase 54 ft 8 in (16.66 m)
Length 68 ft 0 in (20.73 m)
Width 8 ft 8 in (2.64 m)
Height 12 ft 11¾ in (3.96 m)
Weight 108 long tons (110 t)
Fuel capacity 850 imp gal (3,900 l; 1,020 US gal)
Prime mover Maybach MD655, 2 off
Transmission Hydraulic
Multiple working Not fitted
Top speed 90 mph (140 km/h)
Power output Engines: 1,350 bhp (1,007 kW) × 2
At rail: 2,000 hp (1,491 kW)
Tractive effort Maximum: 66,700 lbf (297 kN)
Continous: 45,200 lbf (201 kN)@ 14.5 mph (23.3 km/h)[1]
Train heating Steam
Locomotive brakeforce 50 LTf (498 kN)
Train brakes Vacuum
Career British Railways
Number D1000–D1073
Nicknames ‘Westerns’ & ‘Wizzo's’
Axle load class Route availability 7
Retired 1973–1977

British Rail assigned Class 52 to the class of 74 large Type 4 diesel-hydraulic locomotives built for the Western Region of British Railways between 1961 and 1964. All were given two-word names, with the first word being Western, and thus the type became known as Westerns.

Contents

Historical context

When switching to diesel traction as part of the Modernisation Plan of the 1950s BR designed, and commissioned designs for, a large number of locomotive types. At this time (and arguably right up until Sectorisation in the 1980s), BR's regions had a high degree of autonomy, which extended as far as classes of locomotives ordered, and even the design criteria for those locomotives. Whilst almost all other diesel locomotives were diesel-electric, the Western Region employed a policy of utilising diesel-hydraulic traction, originally commissioning three classes of main line locomotives— a type 2 and two type 4s (later designations class 22, class 41 and class 42). With pressure to increase the speed of the transition from steam to diesel, volume orders for the class 22 and class 42 followed in 1957, a mere two years after the original orders, and well before any idea of performance or reliability could be gained. At the same time it was realised that all of the existing orders (both diesel-electric and diesel-hydraulic) were for types 1, 2 and 4; thus orders were placed for 101 Type 3 diesel-hydraulics (later Class 35). However the increasing demands for more powerful locomotives prompted a further order, in 1961, for 74 diesel-hydraulics of 2,700 hp (2,000 kW); so when the first locomotive was outshopped from Swindon Works in December 1961, less than a year after the order was placed, the Westerns were born.

The theoretical advantage of diesel-hydraulic was simple—it resulted in a lighter locomotive than equivalent diesel-electric transmission. This resulted in better power/weight ratio, and decreased track wear. Unfortunately, it had two key disadvantages:

  • The technology was proven in continental Europe, particularly Germany, but was new to the UK. It was considered politically unacceptable at the time for the UK government to order trains from foreign companies, let alone German companies so soon after the second world war.
  • The most robust hydraulic transmissions were only capable of handling engines with power output of around 1500 hp (1120 kW); to build a more powerful locomotive would involve two diesel engines and two transmissions.

Experience showed that the Bristol-Siddeley-Maybach engines were superior to those made by NBL-MAN, and although the use of twin engines in the same locomotive was new, the process did not produce any problems which were insurmountable. In the end the diesel-hydraulic experiment foundered on low fleet numbers, poor maintenance conditions, and design issues; not on its German heritage or development of a novel configuration.

The Western

With the Hymeks and Warships already in service, but proving under-powered for topline services, BR Western Region needed a high-powered locomotive for top-link services — the Western therefore needed two diesel engines to achieve the required power output. In keeping with their policy, a new locomotive with a hydraulic transmission was envisaged. Experience had shown that the Maybach engines in the Hymeks were superior to the MAN engines used in the Warships, particularly in power output. Also Maybach were able to offer their 12 MD engines rated at 1,350 bhp (1,010 kW) allied to a Voith transmission; a Mekydro transmission designed to handle such power could not be fitted into the British loading gauge.

Western Fusilier at the National Railway Museum

Prototypes sited the engines behind the driving cabs, but drivers found this too noisy; moving the engines centrally meant making the locomotive heavier, removing some of the design's advantage. In production use, the dual-engine arrangement turned out to have some advantages: in particular, the Westerns were able to continue operating with a single engine running in situations where more conventional single-engine designs would require rescue by another locomotive. This valuable property was intentionally duplicated in the later High Speed Trains, and was one reason for them having two power cars.[citation needed]

The most serious continual problem with the class was the design fault mismatch between the Maybach MD655 engines and the Voith L630rV three speed hydraulic transmissions. The top gear ratio in the transmission was too high for the torque characteristics of the engine: the result was that a single locomotive could struggle to reach its claimed 90 mph (140 km/h) top speed in the absence of down grades, more so when work-weary and due for overhaul. These factors, combined with the 'Devon banks' (a major part of their running grounds) deleterious effect on tired engines, all conspired against the Westerns continuing in top-line service; their replacement by High Speed Trains provided the speed and comfort increases the Western Region sought. Towards the end, the Westerns were all allocated to Laira (Plymouth).

Competition and comfort

Whilst the Class was successful, it was non-standard, which added greatly to its high maintenance costs. In any case, British Rail policy was moving away from diesel-hydraulics. When the Westerns were introduced in 1962, the Western Region had 226 diesel-hydraulics and 10 diesel-electrics (excluding shunters); by 1966 the numbers were 345 and 269 respectively. As a result the early 1970s saw the decision taken to retire all the diesel-hydraulic types. Class 46s and Class 47s took over passenger and heavy freight, while Class 25s covered the lighter duties. Class 50s and the arrival of the High Speed Train provided the final nail in the coffin for the Westerns.

Unlike the similar, but lower-powered, Warship class locomotives, most Westerns did receive air brake equipment in addition to their vacuum exhausters, thus significantly extending their working lives. However, as with the Warships, it proved impossible to equip them with electric train heating (ETH, or head-end power in US terminology). The Western Region faced particularly stiff competition for its prime inter-city services in the mid to late 1970s from the M4 motorway, and it was generally felt within BR that significant speed-up and comfort increases on the prime Paddington-Bristol route were necessary. The lack of ETH meant the Westerns could not power the newly-introduced air-conditioned BR Mark 2d/e/f coaches — a shortcoming that the Class 50s, which were built with ETH, did not share.

Names and numbers

While the first Western was under construction, proposals for livery and names were prepared by the BR design panel. The D1000 series locomotives were going to be named after famous West of England place names; the illustration from the portfolio shows D1000 bearing the name Cheddar Gorge. Subsequently all of the Westerns were named, as per the following table:

Number Name Builder Disposition
D1000 Western Enterprise BR Swindon 20.12.61 Scrapped 31.07.74 BREL Swindon
D1001 Western Pathfinder BR Swindon 12.02.62 Scrapped 08.77 BREL Swindon
D1002 Western Explorer BR Swindon 19.03.62 Scrapped 12.06.74 BREL Swindon
D1003 Western Pioneer BR Swindon 14.04.62 Scrapped 08.77 BREL Swindon
D1004 Western Crusader BR Swindon 12.05.62 Scrapped 19.09.74 BREL Swindon
D1005 Western Venturer BR Swindon 18.06.62 Scrapped 17.06.77 BREL Swindon
D1006 Western Stalwart BR Swindon 06.07.62 Scrapped 24.03.77 BREL Swindon
D1007 Western Talisman BR Swindon 01.08.62 Scrapped 24.02.75 BREL Swindon
D1008 Western Harrier BR Swindon 04.09.62 Scrapped 10.10.75 BREL Swindon
D1009 Western Invader BR Swindon 24.09.62 Scrapped 11.78 BREL Swindon
D1010 Western Campaigner BR Swindon 15.10.62 Withdrawn 28.02.77

Preserved by the Diesel & Electric Preservation Group [2]

D1011 Western Thunderer BR Swindon 27.10.62 Scrapped 12.78 BREL Swindon
D1012 Western Firebrand BR Swindon 17.11.62 Scrapped 04.79 BREL Swindon
D1013 Western Ranger BR Swindon 13.12.62 Withdrawn 28.02.77

Preserved by the Western Locomotive Association [3]

D1014 Western Leviathan BR Swindon 24.12.62 Scrapped 13.02.75 BREL Swindon
D1015 Western Champion BR Swindon 21.01.63 Withdrawn 04.01.77

Preserved by the Diesel Traction Group [4]

D1016 Western Gladiator BR Swindon 16.02.63 Scrapped 08.77 BREL Swindon
D1017 Western Warrior BR Swindon 15.03.63 Scrapped 12.03.75 BREL Swindon
D1018 Western Buccaneer BR Swindon 02.04.63 Scrapped 20.03.74 BREL Swindon
D1019 Western Challenger BR Swindon 02.05.63 Scrapped 03.10.74 BREL Swindon
D1020 Western Hero BR Swindon 21.05.63 Scrapped 17.04.74 BREL Swindon
D1021 Western Cavalier BR Swindon 17.06.63 Scrapped 02.79 BREL Swindon
D1022 Western Sentinel BR Swindon 16.07.63 Scrapped 12.78 BREL Swindon
D1023 Western Fusilier BR Swindon 23.09.63 Withdrawn 28.02.77

Preserved as part of the national collection by the NRM

D1024 Western Huntsman BR Swindon 01.10.63 Scrapped 14.08.74 BREL Swindon
D1025 Western Guardsman BR Swindon 01.11.63 Scrapped 01.79 BREL Swindon
D1026 Western Centurion BR Swindon 24.12.63 Scrapped 06.08.76 BREL Swindon
D1027 Western Lancer BR Swindon 28.01.64 Scrapped 10.06.76 BREL Swindon
D1028 Western Hussar BR Swindon 25.02.64 Scrapped
D1029 Western Legionnaire BR Swindon 20.04.64 Scrapped 29.05.75 BREL Swindon
D1030 Western Musketeer BR Crewe 05.12.63 Scrapped 22.09.76 BREL Swindon
D1031 Western Rifleman BR Crewe 20.12.63 Scrapped 06.10.76 BREL Swindon
D1032 Western Marksman BR Crewe 31.12.63 Scrapped 05.12.74 BREL Swindon
D1033 Western Trooper BR Crewe 17.01.64 Scrapped 04.79 BREL Swindon
D1034 Western Dragoon BR Crewe 15.04.64 Scrapped 20.05.77 BREL Swindon
D1035 Western Yeoman BR Crewe 17.07.62 Scrapped 30.09.76 BREL Swindon
D1036 Western Emperor BR Crewe 29.08.62 Scrapped 24.02.77 BREL Swindon
D1037 Western Empress BR Crewe 31.08.62 Scrapped 16.02.77 BREL Swindon
D1038 Western Sovereign BR Crewe 07.09.62 Scrapped 20.11.74 BREL Swindon
D1039 Western King BR Crewe 07.09.62 Scrapped 05.09.74 BREL Swindon
D1040 Western Queen BR Crewe 20.09.62 Scrapped 11.08.76 BREL Swindon (see also #Incidents)
D1041 Western Prince BR Crewe 10.10.62 Withdrawn 23.02.77

Preserved by the Bury Diesel Group [5]

D1042 Western Princess BR Crewe 19.10.62 Scrapped 18.05.74 BREL Swindon
D1043 Western Duke BR Crewe 26.10.62 Scrapped 10.02.77 BREL Swindon
D1044 Western Duchess BR Crewe 12.11.62 Scrapped 10.09.75 BREL Swindon
D1045 Western Viscount BR Crewe 16.11.62 Scrapped 21.08.75 BREL Swindon
D1046 Western Marquis BR Crewe 24.12.62 Scrapped 10.11.76 BREL Swindon
D1047 Western Lord BR Crewe 04.02.63 Scrapped 09.09.76 BREL Swindon
D1048 Western Lady BR Crewe 15.12.62 Withdrawn 28.02.77

Preserved by the Midland Diesel Group [6]

D1049 Western Monarch BR Crewe 14.12.62 Scrapped 03.02.77 BREL Swindon
D1050 Western Ruler BR Crewe 01.01.63 Scrapped 08.04.76 BREL Swindon
D1051 Western Ambassador BR Crewe 21.01.63 Scrapped 08.77 BREL Swindon
D1052 Western Viceroy BR Crewe 04.02.63 Scrapped 22.04.76 BREL Swindon
D1053 Western Patriarch BR Crewe 11.02.63 Scrapped 08.77 BREL Swindon
D1054 Western Governor BR Crewe 02.03.63 Scrapped 05.77 BREL Swindon
D1055 Western Advocate BR Crewe 02.03.63 Scrapped 16.06.76 BREL Swindon
D1056 Western Sultan BR Crewe 08.03.63 Scrapped
D1057 Western Chieftain BR Crewe 06.04.63 Scrapped 06.77 BREL Swindon
D1058 Western Nobleman BR Crewe 25.03.63 Scrapped
D1059 Western Empire BR Crewe 06.04.63 Scrapped 21.07.76 BREL Swindon
D1060 Western Dominion BR Crewe 11.04.63 Scrapped 03.07.74 BREL Swindon
D1061 Western Envoy BR Crewe 19.04.63 Scrapped 07.08.75 BREL Swindon
D1062 Western Courier BR Crewe 06.05.63 Withdrawn 22.08.74

Preserved by the Western Locomotive Association [7]

D1063 Western Monitor BR Crewe 17.05.63 Scrapped 08.77 BREL Swindon
D1064 Western Regent BR Crewe 24.05.63 Scrapped 06.77 BREL Swindon
D1065 Western Consort BR Crewe 18.06.63 Scrapped 08.77 BREL Swindon
D1066 Western Prefect BR Crewe 14.06.63 Scrapped 21.05.75 BREL Swindon
D1067 Western Druid BR Crewe 18.07.63 Scrapped 16.09.76 BREL Swindon
D1068 Western Reliance BR Crewe 12.07.63 Scrapped 08.77 BREL Swindon
D1069 Western Vanguard BR Crewe 21.10.63 Scrapped 03.02.77 BREL Swindon
D1070 Western Gauntlet BR Crewe 28.10.63 Scrapped 05.79 BREL Swindon
D1071 Western Renown BR Crewe 07.11.63 Scrapped 11.78 BREL Swindon
D1072 Western Glory BR Crewe 07.11.63 Scrapped 04.04.77 BREL Swindon
D1073 Western Bulwark BR Crewe 03.12.63 Scrapped 01.08.75 BREL Swindon

D1029 was originally named Western Legionaire [sic] (incorrect spelling), but renamed Western Legionnaire in 1967, the nameplate being cut to allow the additional letter to be inserted.[citation needed]

Although designated Class 52 under the TOPS scheme, no Western ever carried its TOPS number. As withdrawal was already planned when the TOPS numbering scheme was introduced, and because of the cast numberplates, it was not considered necessary.

Liveries

D1062 Westren Courier in maroon, with small yellow warning panel

When the initial batch of Westerns was being built in 1961-2, British Rail was considering a new unified corporate colour scheme, but had not yet made a final decision on what it would be. As a result, D1000 was rolled out of Swindon Works in November 1961 painted in Desert Sand. Initially the numbers, borne on the left hand cab when viewed from the side, were painted on in white, but soon individual numbers and letters, looking like they were cast but apparently made of wood, were fitted. This was in turn replaced by the final design of cast nameplate and numberplate; metal with a black background. This livery was later altered by the addition of a small yellow warning panel and black roof. After this, D1001 was delivered in all over maroon livery with yellow buffer beams, and D1002-D1004 in all over green and small yellow warning panel. The remaining deliveries were all in maroon, with small yellow warning panels after D1009 and D1043 of the Crewe built locomotives. Exceptions to this were the initial Crewe-built batch D1035-D1038 which were in green with red backgrounds to the nameplates, and D1015 which was outshopped in the experimental "golden ochre" livery with one of the small yellow warning panels having narrow whiskers at the top which extended round and onto the bodyside. Some maroon locos retained their original livery while sporting the later full yellow ends.

After the adoption of Rail Blue with full yellow ends in 1966 (D1048 first the first of the class painted in this livery in 1966), for some unexplained reason a small bath of locos (D1030, D1037, D1043, D1047 and D1057) received this variant married to small yellow warning panels, D1030 even carried red buffer beams for a short while. All other repaints were with the full yellow warning panel. The last loco to be repainted into Rail Blue was D1046 which was outshopped from Swindon in May 1971. Some early photographs of the blue livery give it a more metallic shade which is even more evident on the locos with small yellow panels. This has been referred to in the past as "chromatic blue". This however is just a photographic anomaly with early colour film and it has been confirmed that none of the class were ever painted with a metallic paint.

Incidents

  • 15 August 1963. Knowle and Dorridge rail crash. No. 1040 Western Queen collided with a freight train, crushing the cab killing the three train crew.
  • 19 December 1973. Ealing rail crash. No. 1007 Western Talisman derailed while hauling an express passenger train, after an open battery box door broke off and changed points under the locomotive. Ten people died.[1]

Gallery

Bibliography

  • Ford, H L (1973). Diesels on Cornwall's main line. Truro: D Bradford Barton. 
  • Hall, Stanley (2006). Railway Milestones and Millstones. Hersham: Ian Allen Publishing. pp. 125–130. ISBN 0 7110 3110 X. 
  • Judge, Colin (1977). The Power of the Westerns. Oxford: OPC. ISBN 0 902888 98 6. 
  • Kichenside, Geoffrey (1975). Farewell to the Westerns. Newton Abbot: David & Charles. ISBN 0 715370 69 3. 
  • Preedy, Norman E; Gillham, G F (1974). WR Diesel Hydraulics. Truro: D Bradford Barton. 
  • Taylor, Ken. A Decade After. Walsall: Midland Railfans. 
  • Till, J O (1977). Western Stock List. Camberley: Steam & Diesel Publications. 
  • Vaughan, John (1977). Western Diesels in Camera. Shepperton: Ian Allen. ISBN 0 711008 31 0. 
  • Watts, Peter (1977). Western Memories. Gloucester: Peter Watts. ISBN 0 906025 00 1. 

References

  1. ^ "Official accident report". HMSO, reproduced at The Railways Archive. http://www.railwaysarchive.co.uk/documents/DoE_Ealing1973.pdf. Retrieved 2009-09-16. 

External links


Search unanswered questions...
Enter a question here...
Search: All sources Community Q&A Reference topics
 
 

 

Copyrights:

Wikipedia. This article is licensed under the Creative Commons Attribution/Share-Alike License. It uses material from the Wikipedia article "British Rail Class 52" Read more