Share on Facebook Share on Twitter Email
Answers.com

Carmarthen railway station

 
Wikipedia: Carmarthen railway station
Carmarthen
Caerfyrddin
Carmarthen
71000 Duke of Gloucester at Carmarthen station, 26 May 2007
Location
Place Carmarthen
Local authority Carmarthenshire
Operations
Station code CMN
Managed by Arriva Trains Wales
Platforms in use 2
Live arrivals/departures and station information
from National Rail
Annual rail passenger usage
2004/05 * 0.289 million
2005/06 * 0.294 million
2006/07 * 0.323 million
2007/08 * 0.348 million
History
Opened 1902 (1902)
National Rail - UK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual passenger usage based on sales of tickets in stated financial year(s) which end or originate at Carmarthen from Office of Rail Regulation statistics.

Carmarthen railway station is situated south of the River Towy on the edge of the town of Carmarthen. It is located on the West Wales Line and is managed by Arriva Trains Wales, who operate most of the passenger trains serving it. First Great Western also operates a limited service to London Paddington from here (currently a single daily train each way).

The present station is the third to serve the town and dates from 1902,[1] although the South Wales Railway's main line from Swansea to Neyland reached it some fifty years earlier. This original station was built with westward expansion in mind (being located at the base of the triangular junction half a mile south of the present station) and was poorly sited for the town itself. A second station (Carmarthen Town) was opened by the Carmarthen and Cardigan Railway in 1860[2] on its route northwards towards Conwil and Pencader which was much better sited for the town (on the opposite side of the river) and this remained in use until its replacement by the current station shortly after the turn of the century. The Town station did however remain in use for goods traffic thereafter beyond the closure of the final portion of the line Carmarthen and Cardigan Railway in September 1973, until the goods yard closed in the early 1980s and the single track girder bridge bridge over the River Tywi was removed during 1983.

The Carmarthen and Cardigan Railway, in spite of its name, never actually reached Cardigan, as it was constructed only as far as Newcastle Emlyn (which wasn't reached until 1895). Cardigan was eventually served instead by the winding Whitland and Cardigan Branch Line from Whitland, the primary junction in Pembrokeshire. The C&CR did however link up with the ill-fated Manchester and Milford Railway at Pencader, putting the town on a through route to Aberystwyth by 1867. Another outlet to the north came courtesy of the Llanelly Railway's branch from Llandeilo, which reached Abergwili Junction in 1864 and whose trains reached the Town station by means of running powers following its takeover by the LNWR in 1873. The final link in the chain of lines to the north was added in 1911, when a branch line from Lampeter to Aberaeron was opened by the Lampeter, Aberayron and New Quay Light Railway. This was worked by the Great Western Railway from the outset, as the company had by this time absorbed the other lines mentioned (apart from the Llandeilo branch, which remained in LNWR hands until the 1923 Grouping).

Today though none of the lines to the north survive, the first round of closures having begun as early as May 1951 when the Aberaeron line lost its passenger trains. The Newcastle Emlyn line followed suit in September 1952, whilst the Llandeilo branch went in September 1963 and the 'main line' to Aberystwyth in February 1965[3], although milk trains continued to operate as far as Pont Llanio (near Tregaron on the Aberystwyth maine line until 1970, and to Newcastle Emlyn and to Felinfach on the Aberaeron branch until September 1973. This left only the original South Wales Railway main line to serve the station and left it as a terminus at the end of short spur from the main line at which all trains have to reverse before continuing their journeys. This was not so much of a problem with DMUs but led to the need for a run-round of locomotive hauled trains which were regularily used until the mid 1980s.

The station has two remaining platforms. Almost all services use platform 1 which has a full set of canopies, toilets and facilities. The bare platform 2 is the other side of the reversing loop and only used as overflow and for storage of trains overnight. Almost uniquely for a British mainline station (though examples exist on quiet branches) access to platform 2 is by a flat crossing across the tracks at the end of the reversing loop. The other platform and sidings are no longer used and await removal. With the replacement of locomotive hauled services by DMU units and High Speed Trains the reversing loop is only very rarely used by special services such as the Royal Train.

The requirement for trains to turn around limits train length and also prevents services making a short stop at Carmarthen. Plans now exist to replace the station (which is on what is now valuable land in the new development) with a new station directly on the main line on the site of the original South Wales Railway station.[citation needed]

Historically the line to Aberystwyth and Llandeilo continued beyond the station across the river past the site of the goods yard (now a builders yard) and then has been buried under the Carmarthen eastern by-pass dual carridgeway as far as the former Abergwili Junction. The Aberystwyth line then turned north out to Bronwydd Arms. From Abergwili Junction northwards, the railway trackbed resumes and is owned by the Gwili Railway which runs preserved trains up the Aberystwyth line as far as Danycoed near to Cynwil Elfed.

Contents

Services

The station is served by ATW trains between Swansea and Milford Haven and Pembroke Dock, plus the aforementioned single FGW train to/from London. The latter runs through to Pembroke Dock (along with a second through train) on Summer Saturdays. Many of the Swansea trains (including those from Milford Haven) continue to Cardiff, Newport and the Welsh Marches Line to Manchester Piccadilly. This gives the station a half-hourly service to Swansea for parts of the day, with two-hourly (plus peak extras) to Pembroke Dock and Milford Haven. The twice-daily service to/from Fishguard also calls here, although the daytime train runs direct to/from Cardiff rather than via Swansea.

Notes

  1. ^ Body, pp.54-55
  2. ^ Page, p.130
  3. ^ Page, p.195

References

  • Body, G. (1983), PSL Field Guides - Railways of the Western Region, Patrick Stephens Ltd, Wellingborough, ISBN 0-85059-546-0
  • Page, J. (1988), Forgotten Railways: Volume 8 - South Wales (2nd Ed), David & Charles Publishers, Newton Abbott, ISBN 0-946537-44-5

External links

Preceding station National Rail Following station
Ferryside   Arriva Trains Wales
West Wales Line
  Whitland
Pembrey and Burry Port   First Great Western
London - Carmarthen
  Terminus
Pembrey and Burry Port   First Great Western
London - Pembroke
  Whitland


Coordinates: 51°51′11″N 4°18′22″W / 51.853°N 4.306°W / 51.853; -4.306


Search unanswered questions...
Enter a question here...
Search: All sources Community Q&A Reference topics
 
 

 

Copyrights:

Wikipedia. This article is licensed under the Creative Commons Attribution/Share-Alike License. It uses material from the Wikipedia article "Carmarthen railway station" Read more