Share on Facebook Share on Twitter Email
Answers.com

DB Schenker Rail

 
Wikipedia: DB Schenker Rail (UK)
DB Schenker Rail (UK) Ltd.
Type Rail industry (freight)
Predecessor English, Welsh and Scottish Railway
Headquarters United Kingdom Doncaster, England, UK
Key people Feb 2009[1]
Keith Heller, Chief Executive
David Kerr, Commercial Director
Michael Lawrence, Chief Financial Officer
Graham Smith, Planning Director
Helene Norman-Dupuy, Communications Director
Gerry Skelton, Human Resources Director
Geoff Spencer, Director Resources
Guy Mason, Chief Information Officer
Industry Rail
Services Bulk freight and intermodal logistics
Parent Deutsche Bahn AG via DB Schenker
Divisions Energy (transportation of coal etc)
Network (Intermodal and logistics)
Construction (transportation of building aggregates and water)
Industrial (transportation of metal and petroleum products)[2]
Subsidiaries Euro Cargo Rail
Website http://www.rail.dbschenker.co.uk

DB Schenker Rail (UK), previously known as English, Welsh and Scottish Railway (EWS), is the largest British rail freight company. It was created as a result of the break-up of British Rail during the 1990s and is now a subsidiary of Deutsche Bahn AG.

EWS was established by a consortium led by Wisconsin Central Ltd in 1996. Canadian National bought Wisconsin Central in 2001, and held approximately 30% of the company.

English, Welsh and Scottish Railway was acquired by Deutsche Bahn AG on 28 June 2007.[3] Initially it was announced that EWS would not be rebranded,[4] but on 1 January 2009 EWS, along with DB's other existing freight organisations Railion and their freight logistics organisation Schenker AG were re-branded DB Schenker.[5]

Contents

History

The first stage of the creation of EWS occurred at 0500 on Saturday 9 December 1995 when it was announced that Rail Express Systems had been sold to a consortium led by Wisconsin Central for £25.7 million and renamed North & South Railways Ltd. Included in the sale were 164 locomotives, 677 vans, depots at Crewe, Bristol Barton Hill, Cambridge and Euston Downside (London), and 800 staff. North & South Railways confirmed that it was bidding for all three of the former BR trainload freight companies: Trans-Rail, Mainline Freight and Load-Haul.

The former English, Welish & Scottish logo.

The UK Government had hoped to sell the three trainload freight companies as separate businesses to encourage competition. Few bidders were interested in individual companies because of the threat of competition from the other two, but the outright purchase of all three was an attractive proposition.

By December 1995, there were just two bidders in the running for the trainload companies:

In early 1996 it was announced that Wisconsin Central/North & South Railways was the preferred bidder, and on 24 February 1996 the contract was signed. Later that day the formal handover from BRB chairman John Welsby to Wisconsin Central President Ed Burkhardt took place at a ceremony at London’s Marylebone station. Burkhardt announced several plans for the following two years:

Four Class 60s at Peak Forest on 16 January 2005
  • Order 250 new heavy freight locomotives - EWS bought 250 Class 66 locomotives
  • Condemn most of the Class 37s and ‘ageing and unreliable’ Class 47s
  • Withdraw all the remaining Trainload Class 20s and Class 33s
  • Close “a very great many” diesel depots
  • Merge the three freight companies with Rail Express Systems
  • Reinstate stored Class 08s if increased business warranted it
  • Rename the new company ‘London, Central & Scottish Railway’, or similar

£225.15 million was paid for the three trainload freight businesses, which carried 88.7 million tonnes of freight the previous year with a turnover of £559 million. Some critics said that the figure paid was less than the 10% of their replacement value, estimated at an astonishing £3 billion, as they were the only profitable national freight businesses in Europe. Subsequently, Wisconsin Central/North & South Railways purchased Railfreight Distribution and National Power's railfreight operation.

In 2001, Canadian National bought Wisconsin Central and so became overall owners of EWS.

Acquisition of EWS by Deutsche Bahn

On 28 June 2007, it was announced at a press conference held by Deutsche Bahn AG (DB), EWS and Spanish rail forwarder Transfesa that DB was to acquire all the shares in EWS as soon as contracts were signed.[3] Initially it was announced that EWS would not be rebranded,[4] but on 1 January 2009 EWS, DB's existing Freight organisation Railion and their freight logistics organisation DB Schenker were re-branded DB Schenker.[6]

As part of a formal launch of the new brand,[7] a Class 59 locomotive 59206 was unveiled in full DB Schenker branding at a ceremony at the National Railway Museum in York. Class 66 number 66152 became the third loco to receive the new DB Schenker colour scheme. The next loco's to receive the colours of DB Schenker were Class 37's, 37419 and 37670.[8]

Traction and rolling stock

Image Class Use Image Class Use
Locomotive EWS 08865.jpg
08

Used for shunting and minor freight work. Limited to 15 mph.

EWS59202+barriermk1-04.jpg
59

Used for aggregate transportation from quarries in the West Country. Some Class 59s have been seen on railtours around Yorkshire. Limited to 75 mph.

EWS-60019-CardiffCentral-01.jpg
60a

Used for slow coal transport like to Fiddler's Ferry in Widnes, Cheshire. They are also seen on some heavy haul coal and aggregate services. Limited to 60 mph.

37411 'The Scottish Railway Preservation Society' at Carlisle.JPG
37

Most have been withdrawn and stored/sold, although a small fleet is to be retained for specific duties. Limited to 80 mph.

92001 'Victor Hugo' at Crewe Works.jpg
92

Built for use in Europe as well as the UK, they've never left the Chunnel. They are very capable of hauling heavy loads and reliable. One has been seen pulling a coal train consisting of two Class 66s, a Class 60 and a Class 67. This locomotive can be used on 25 kV AC overhead lines and also DC 3rd rail lines due to its dual voltage system. Limited to 90 mph (75 mph on freight trains).

67017 'Arrow' at Plymouth.JPG
67

DB Schenker's fastest locomotives, with a max speeds of 125 mph, four (67004/007/009 & 011) however are limited to 80 mph due to brake modifications for hauling the ScotRail Sleepers north of Edinburgh. These locos are solely operated by EWS. Locomotives 67005 and 67006 also operate the 'Royal Train'. They also are used for freight and weed-killing trains. They have a high axle-load, and are subject to severe speed restrictions in some areas.

66713 'Forest City' at Crewe Works.jpg
66

Used for almost all workings. They are used on most heavy haul workings and certain railtours. Limited to 75 mph.

90017 at Norwich.JPG
90

EWS's Bo-Bo mixed-traffic electric locomotives has a max speed of 110 mph, although apart from occasional railtours on the West and East Coast Main Lines or on loans to 'Virgin Trains' the usually operate at 75-80 mph. They are used all over the country for freight work on electrified lines. Their most notable passenger operation is the First ScotRail Caledonian Sleeper between London Euston and Scotland on the WCML where the trains are formed of sixteen coaches - the longest passenger train length in the UK.

DB Schenker Rail are working to enable Class 92 trains to operate freight services on High Speed 1. The project has received funding from the European Commission and it is anticipated services will being in early 2010.[9][10]

See also

Further reading

  • Sutton, Philip (August 2007). "Burkhardt on EWS". Rail Express 135: 32–7. 

References

External links


Search unanswered questions...
Enter a question here...
Search: All sources Community Q&A Reference topics
 
 

 

Copyrights:

Wikipedia. This article is licensed under the Creative Commons Attribution/Share-Alike License. It uses material from the Wikipedia article "DB Schenker Rail (UK)" Read more