| Location | Herne Hill |
|---|---|
| Local authority | London Borough of Lambeth |
| Managed by | Southeastern |
| Station code | HNH |
| Platforms in use | 4 |
| Fare zone | 2 and 3 |
| NR 2004/5 usage | 1.636 million[1] |
| NR 2005/6 usage | 1.619 million[1] |
| NR 2006/7 usage | 2.354 million[1] |
| NR 2007/8 usage | 4.062 million[1] |
|
|
|
| 25 August 1862 | Opened |
|
|
|
| List of stations | Underground · National Rail |
| External links | Departures • Facilities |
Herne Hill railway station is in Herne Hill, a location in the London Borough of Lambeth, South London, England. Its location is grid reference TQ319744.
The station is above road level near the junction of five main roads, between Railton Road and Milkwood Road. There is no entrance in Milkwood Road, but there is a corridor between the two roads, from which it is possible to enter the station. There is a bus stop in front of the station entrance. There are four platforms.
For many years, there was a large chip missing from one of the slabs forming the edge of platform 3. This was not the result of damage occurring after the slab was installed: workmen installed a slab that was already chipped.
The original brick buildings at street level, with arched window decoration, are still a feature. The more modern buildings on the two island platforms provide faces to the main lines and the Up and Down passenger loops. The platform on the Up (northbound) side includes a coffee bar and waiting room for connecting passengers; there are fewer facilities on the Down (southbound) side.
There is a flat junction at each end of the station; Herne Hill North Junction, where the lines to Loughborough Junction and Brixton diverge;, and Herne Hill South Junction, where the lines to West Dulwich and Tulse Hill diverge.
The station was opened by the London, Chatham and Dover Railway, as part of its main access route to London Victoria station, on 25 August 1862. The station is served by South Eastern Trains to south east London and Kent and by First Capital Connect trains from Luton to Wimbledon via Sutton. Until the First World war, some main line trains were divided and joined at Herne Hill.
There have been rumours that the Victoria Line may be extended to Herne Hill to provide faster turnaround at the southern end of the line.[2][3]
Contents |
Accident
On 6 November 1947 a collision occurred at the south junction involving an EMU and a steam train, caused by unsatisfactory "fogging" procedures leading to a signal at danger being passed by the steam train. The steam train ran into the side of the correctly signalled EMU, which was crossing its path at the flat junction. One fatality and nine hospitalised passengers resulted from this accident.
Services
The current off-peak service pattern from Herne Hill station comprises the following:
- 4tph (trains per hour) to London Victoria via Brixton
- 4tph to Orpington via Beckenham Junction
- 2tph to Luton via Elephant & Castle
- 2tph to St Albans via Elephant & Castle
- 2tph to Sutton via Wimbledon
- 2tph to Wimbledon via Sutton
There are also two services per day to Brighton and occasional services from London Victoria to Maidstone East and Ashford International calling at Herne Hill.
| Preceding station | National Rail | Following station | ||
|---|---|---|---|---|
| Loughborough Junction |
First Capital Connect Sutton Loop |
Tulse Hill | ||
| Brixton | Southeastern Victoria - Orpington |
West Dulwich | ||
| Loughborough Junction |
Southeastern Bedford - Beckenham Junction (Mondays-Fridays only) |
West Dulwich | ||
Future
From the Autumn of 2012, the station will be increasingly busy as Thameslink trains destined for London Bridge will be diverted through Herne Hill from East Croydon to Blackfriars. This is because of the large scale redevelopment of London Bridge Station which will close to First Capital Connect (Bedford-Brighton) Services. It is unclear if these services will call at Herne Hill as plans are in a draft format - but other services may be affected.
London, Chatham and Dover Railway
In 1864 the line was extended Northwards through Loughborough Junction, Camberwell, Walworth Road, Borough Road to Blackfriars Bridge railway station as part of the company's ambitious City Branch which eventually saw trains running through the Snow Hill tunnel into the City of London. This service was discontinued in 1916 and the trains terminated at Holborn Viaduct station instead. In the late 1980s the link was re-opened and today the former City Branch forms the basis for the Thameslink system.
| Preceding station | Disused railways | Following station | ||
|---|---|---|---|---|
| Loughborough Junction | London, Chatham & Dover Railway City Branch |
Terminus | ||
Gallery
| Wikimedia Commons has media related to: Herne Hill railway station |
|
A 1908 Railway Clearing House map of lines around the Brighton Main Line and Chatham Main Line in South London. |
A 1914 Railway Clearing House map of lines around Herne Hill railway station. |
References
- ^ a b c d Annual passenger usage based on sales of tickets in stated financial year(s) which end or originate at Herne Hill railway station from Office of Rail Regulation statistics
- ^ Clive's Underground Line Guide - Future projects page, Accessed October 11, 2007
- ^ "Going Underground"'s future projects page, South London, Annie Mole, Accessed October 11, 2007
External links
- Train times and station information for Herne Hill railway station from National Rail
Coordinates: 51°27′12″N 0°06′08″W / 51.4533°N 0.1021°W
|
|||||||||||
This entry is from Wikipedia, the leading user-contributed encyclopedia. It may not have been reviewed by professional editors (see full disclaimer)




