Share on Facebook Share on Twitter Email
Answers.com

Interstate 25 in Colorado

 
Wikipedia: Interstate 25 in Colorado
Interstate 25 shield
Interstate 25
Main route of the Interstate Highway System
Maintained by Colorado Department of Transportation
Length: 305.040 mi[1] (490.914 km)
South end: I-25 (NM).svgUS 85.svgUS 87.svg I-25 / US 85 / US 87 at New Mexico state line
Major
junctions:
US 50.svg US 50 in Pueblo
US 24.svg US 24 in Colorado Springs
US 36.svg US 36 in Denver
US 40.svg US 40 in Denver
I-70.svg I-70 in Denver
I-76.svg I-76 near Denver
US 6.svg US 6 near Denver
US 34.svg US 34 near Loveland
North end: I-25.svgUS 87.svg I-25 / US 87 at Wyoming state line
Colorado State Highways
< US 24.svg US 24 SH 26 Colorado 26.svg >

In the U.S. state of Colorado, Interstate 25 follows the north-south corridor through Colorado Springs and Denver. It replaced U.S. Highway 87 and most of U.S. Highway 85 for through traffic.

Historical nicknames for this route have included the Valley Highway (through Denver), Monument Valley Highway (through Colorado Springs), and the Pueblo Freeway (through Pueblo). Within El Paso County, the route has been dedicated as the Ronald Reagan Highway.[2][3] In Pueblo County, the route is called John F. Kennedy Memorial Highway.

Interstate 25 is also considered to be part of the unofficial Pan-American Highway.[4]

Contents

Route description

New Mexico state line to Pueblo

I-25 swerves near the east side of Trinidad Lake State Park.

Following the Santa Fe Trail from New Mexico, Interstate 25 enters Colorado as a typical two-lane Interstate Highway, where its entire route in Colorado lies close to the east side of the Rocky Mountains. The route turns from north to west-northwest as I-25 serves Wootton. After leaving Wootton, I-25 turns back up north and bypasses near the east side of the Trinidad Lake State Park, home of the Trinidad Lake.

Trinidad, a city near the Trinidad Lake, is the first major city that lies along I-25. For the next 30 miles (48 km), I-25 continues north through the rural areas of Colorado until it reaches the small city of Walsenburg, where the business route - I-25 Bus. - junctions with U.S. Highway 160. I-25 then continues in a north-northwest direction until it bypasses the Orlando Reservoir, then turns north from there until it reaches Colorado City. In Colorado City, I-25 interchanges with the east end of the Frontier Pathways Scenic and Historic Byway (SH 165) at exit 74.

After leaving the city, I-25 follows in a north-northeast orientation until it reaches the St. Charles Reservoir just before entering the city of Pueblo, with the first exit within the southern city limits of Pueblo at exit 94.[5] The Arkansas River in Pueblo serves as a feeder to the Pueblo Lake State Park, home of the Pueblo Lake, which is located to the west of the western city limits of Pueblo.[6]

Pueblo to Denver

After leaving Pueblo, I-25 continues up north with the Union Pacific Railroad line paralleling closely to the route on the right side after interchanging with Porter Draw at exit 106. By exit 119, the Fountain Creek joins along and travels parallel with I-25, and continues all the way to the Fountain Creek National Park in Pueblo. I-25 gradually turns from a general north direction to the north-northwest and serves the census-designated place of Buttes at exit 122.

Cheyenne Mountain, as seen from I-25 near Fort Carson. Note the communications antennas at the summit, which are used by NORAD.

As soon as US 85 leaves I-25 at exit 128, I-25 enters the city limits of Fountain. Basically, I-25 serves as the border between the western city limits of Fountain on the east side of I-25 and Fort Carson on the west side. Exit 132 (SH 16) serves the north side of the Fountain Creek National Park as well as the entrance to Fort Carson. At exit 135, Academy Boulevard serves Pikes Peak Community College's Centennial campus. By the time I-25 reaches exit 138, the route enters the city limits of Colorado Springs, where the interchange with US 24 at exit 139 serves the Evergreen Cemetery and Prospect Lake. I-25 turns west at exit 140, along with the Fountain Creek, where it interchanges with US 85, US 87, and I-25 Bus. I-25 again turns back north again by exit 141. Exit 142 serves downtown Colorado Springs,[5] and to the north of the city lies the Colorado College, and is served at exit 143 - Uintah Street. After leaving Colorado Springs, I-25 enters the United States Air Force Academy from exits 150 to 156, and goes through the east side of the territory.

Map showing I-25 and nearby freeways and major highways in the Denver Metropolitan area

I-25 leaves El Paso County and enters Douglas County at the county line at exit 163. I-25 then continues north through more rural areas east of the Rocky Mountains until reaching Castle Rock at exit 181. I-25 continues through a variety of suburban communities until interchanging with E-470, the partial beltway of Denver as the toll road serves the Centennial Airport and the much larger Denver International Airport.

After entering Arapahoe County, I-25 interchanges with I-225, a spur that detours motorists to I-70, at exit 200. I-25, then goes around in a general northwest direction before interchanging with US 6 at exit 209. Then I-25 curves around the west side of downtown Denver,[5] where it can be accessed by I-70 Bus. at exit 210.[5] I-25 then interchanges with I-70 at exit 213 right before leaving the City and County of Denver. [6]

Denver to Wyoming state line

As I-25 leaves Denver, the route continues up north and interchanges with I-76, I-270, and the Denver-Boulder Turnpike (US 36). Due to the complexity of this triangle-shaped interchange, it was known to be one of many malfunction junctions throughout the United States. Beyond that interchange and exit 220, I-25 slips its way through a narrow path between the Badding Reservoir (west side) and the Croke Lake (east side).

At exit 228, I-25 interchanges with the northern termini of E-470 and Northwest Parkway at a stack interchange, with the Larkridge Mall just to the north, served by 160th Avenue (SH 7). As I-25 continues north, it passes through a medley of lakes and reservoirs to the east and north of Fort Collins.[5] Afterwards, the interstate gradually makes a north-northeast turn as it heads for the Wyoming state line.[6]

History

Ancestors and early freeways

Colorado had begun planning of a modern inter-city route along the Front Range as early as 1944, well before the national movement toward an Interstate Highway system.

State Highway 1, an unpaved road, was completed between Denver and Pueblo by 1919. Average travel time between Pueblo and Colorado Springs on this route was approximately 2.5 hours (or a full 8.5 hours from Pueblo to Denver). This route was upgraded with the help of the federal government to become US 85 and US 87 by 1930, now paved in concrete and shortening the travel time between Pueblo and Colorado Springs to just one hour.

The cities of Denver (in 1948) and Pueblo (in 1949) were first to begin building multi-lane highway segments along the route of what would eventually become Interstate 25. Denver's segment was originally known as the Valley Highway and was completed by 1958. The city of Colorado Springs followed a similar theme with their Monument Valley Freeway, begun in 1955 and completed by July 1960. Pueblo's section — the Pueblo Freeway - was complete by July 1959.[3]

Interstate completion

As the national Interstate Highway System began to take shape, actual "inter-state" connections began to be made. Wyoming came first in 1964, building a 9-mile (14 km) link north to Cheyenne that was connected to Colorado's 17-mile (27 km) stretch.

Linking to New Mexico in the south would prove more problematic as the planned route had to stretch over Raton Pass, and its accompanying 1,800-foot (550 m) elevation change, within just 13 miles (21 km). Once again, US 85 and US 87 were used, but it had to be re-graded in places to meet Interstate design guidelines. Construction began in 1960, with a link to the city of Trinidad completed by 1963. The Trinidad Segment (as CDOT now calls the Raton Pass span) was not fully completed until 1968.

The final segment of the Colorado portion of Interstate 25, connecting the cities of Walsenburg and Trinidad, was completed during 1969. This meant that four lanes of high-speed, nonstop freeway were finally open for a total of 299 miles (481 km) from New Mexico north to Wyoming.[3][7]

Modern expansion

As both population and traffic increased in Colorado during the 1990s and 2000s, the Colorado Department of Transportation has planned and completed major improvements for the city corridors along I-25.

T-REX (Denver)

T-REX Logo

The first of these was Transportation Expansion (T-REX), which widened and expanded nearly 17 miles (27 km) of both I-25 and the I-225 bypass in the Denver Metro area as well as adding various pedestrian and aesthetic improvements. T-REX was also instrumental in expanding Denver's RTD light rail lines to connect outlying communities beyond the city and county of Denver, adding 19 miles (31 km) of new routes.[8][9]

Starting in early 2004, the T-REX project was completed during 2006 at a cost of US$1.67 billion, under its projected budget and two years ahead of its originally scheduled conclusion. It has been hailed as a "model for other cities to follow" and "ahead of the curve nationally" by federal transportation and transit authorities.[9]

COSMIX (Colorado Springs)

COSMIX Logo

As T-REX began to wrap up, CDOT's next major effort began with Colorado Springs Metro Interstate Expansion (COSMIX). It could be argued that COSMIX was even more important to Colorado's interests than T-REX had been, since the Colorado Springs corridor of I-25 had seen immense growth over the past four decades. Originally carrying around 8500 vehicles per day in 1960, usage of the former Monument Valley Freeway had grown to an average of 100,000 vehicles per day by 2005.[10]

The major goals of COSMIX, which began in 2005 and was completed during December 2007, were a general expansion and widening of the corridor to three lanes in each direction throughout the city, as well as the reconstruction of two main interchanges (at Bijou Street near downtown Colorado Springs, and at Rockrimmon Boulevard and North Nevada Avenue in the city's growing north side).[11]

Though CDOT's role in COSMIX was complete, the City of Colorado Springs continued its own independent project to rebuild the Cimarron Street (US 24) bridge and interchange. This work was functionally complete (allowing limited traffic) by May 2008, with full completion achieved by September 2008.[12]

Future

Since 2006, the Colorado Department of Transportation has begun work toward expanding the I-25 corridor between Colorado Springs and Denver, as well as the corridor between Denver and the city of Fort Collins (the "North Forty" project, in reference to the 40 miles (64 km) of highway north of Denver that are affected). In both cases, growth of suburbs and smaller communities (such as Castle Rock and Longmont) have necessitated expansion much like that of T-REX or COSMIX (though on a less ambitious scale).[13][14]

Reconstruction of the aging Trinidad Segment is also underway, aimed mainly at rebuilding bridges and upgrading the highway to modern Interstate design standards. Construction began with demolition and reconstruction of the bridges during 2007, and the remaining viaduct reconstruction is currently scheduled to be completed by August 2009.[15]

A New Pueblo Freeway project is in the planning stages. Currently, the draft includes an expansion to six lanes (three each direction), numerous interchange improvements, and enhancements to pedestrian routes and public parks along the corridor. Public review of the final plan is scheduled for the Fall of 2008.[16]

Exit list

County Location Mile[1] # Destinations Notes
Las Animas 2.134 2 Wootton
5.597 6 Gallinas
7.529 8 Springcreek
11.013 11 Santa Fe Trail – Starkville
Trinidad 13.000 13A Santa Fe Trail
13.311 13B Main Street (SH 12 west)
13.606 14A Colorado 12.svg SH 12 west – Cuchara, La Veta Removed (now signed via exit 13B)
13.606 14B Business Loop 25.svg I-25 Bus.Trinidad
14.859 15 US 160.svg US 160 east (Kit Carson Trail) South end of US 160 overlap
17.728 18 El Moro Road
22.906 23 Hoehne Road
26.858 27 Ludlow
30.464 30 Aguilar Road
34.090 34 Aguilar (I-25 Bus. west)
Huerfano 40.485 41 Rugby Road
41.930 42 Pryor
Walsenburg 49.000 49 Business Loop 25.svgUS 160.svg I-25 Bus. north to US 160 west – Walsenburg, Alamosa
50.054 50 Colorado 10.svg SH 10 east (US 160 west) – La Junta North end of US 160 overlap
52.321 52 Business Loop 25.svgColorado 69.svgUS 160.svg I-25 Bus. south / SH 69 west to US 160 west – Gardner, Westcliffe, Walsenburg, Alamosa
55.000 55 Airport Road
56.000 56 Redrock Road
58.727 59 Butte Road
60.084 60 Huerfano
64.046 64 Lascar Road
66.749 67 Apache
Pueblo 71.264 71 Graneros Road
74.367 74 Colorado 165.svg SH 165 west – San Isabel, Colorado City, Rye
77.267 77 Abbey Road, Hatchet Ranch Road
83.461 83 (unnamed road)
86.938 87 Verde Road
87.921 88 Burnt Mill Road
90.625 91 Stem Beach
Pueblo 94.769 94 Colorado 45.svg SH 45 north (Pueblo Boulevard)
95.901 96 Minnequa Avenue, Indiana Avenue
96.673 97A Central Avenue
97.447 97B Abriendo Avenue
97.691 98A Business plate.svg
US 50.svg US 50 Bus. east – La Junta
98.545 98B Colorado 96.svg To SH 96 / 1st Street
98.806 99A Colorado 96.svg To SH 96 / 6th Street Southbound exit and northbound entrance
99.334 99B 13th Street, Santa Fe Avenue
99.950 100A US 50.svg US 50 east – La Junta, Pueblo Memorial Airport South end of US 50 overlap
100.681 100B 29th Street
101.389 101 US 50.svg US 50 west (SH 47 east) – Canon City, Royal Gorge North end of US 50 overlap
102.160 102 Eagleridge Boulevard
103.896 104 Eden
106.075 106 Porter Draw
108.000 108 Purcell Boulevard – Pueblo West
110.238 110 Pinon
114.000 114 Young Hollow
115.831 116 County Line Road
El Paso 118.843 119 Rancho Colorado Boulevard
121.459 122 Pikes Peak International Raceway
123.189 123 (unnamed road)
Fountain 124.564 125 Ray Nixon Road
127.860 128 US 85.svg US 85 north – Fountain North end of US 85 overlap
131.653 132 Colorado 16.svg SH 16 (Mesa Ridge Parkway) – Fort Carson, Fountain
Security-Widefield 135.262 135 Colorado 83.svg SH 83 (Academy Boulevard)
Colorado Springs 137.752 138 Colorado 29.svg SH 29 (Circle Drive)
138.742 139 US 24.svg US 24 east – Limon South end of US 24 overlap
139.747-
139.869
140 Business Loop 25.svgUS 85.svgColorado 115.svg I-25 Bus. north / US 85 (Nevada Avenue) to SH 115 south / Tejon Street
141.139 141 US 24.svg US 24 west (Cimarron Street) – Manitou Springs, Pikes Peak North end of US 24 overlap
141.849 142 Bijou Street – Downtown Colorado Springs
142.832 143 Uintah Street
143.520 144 Fontanero Street
144.622 145 Colorado 38.svg SH 38 east (Fillmore Street)
146.074 146 Garden of the Gods Road
147.046 147 Rockrimmon Boulevard
147.570 148A Business Loop 25.svg I-25 Bus. south (Nevada Avenue, US 85 south) South end of US 85 overlap; no southbound entrance
148B Corporate Centre Drive Southbound exit and entrance
148.830 149 Woodmen Road
150.303 150 Colorado 83.svg To SH 83 / Academy Boulevard
151.660 151 Briargate Parkway
152.899 153 Interquest Parkway
155.930 156A Gleneagle Drive
Air Force Academy 155.930 156B North Entrance Air Force Academy
Monument 158.199 158 Baptist Road
160.763 161 Colorado 105.svg SH 105Palmer Lake, Monument
163.321 163 County Line Road – Palmer Lake
Douglas
167.464 167 Greenland
171.820 172 Upper Lake Gulch Road
172.307 173 Larkspur Southbound exit and northbound entrance
173.791 174 Tomah Road
Castle Rock 180.808 181 Wilcox Street, Plum Creek Parkway
181.853 182 Wilcox Street, Wolfensberger Road
184.212 184 US 85.svgColorado 86.svg US 85 north (Meadows Parkway) / SH 86 east / Founders Parkway North end of US 85 overlap
186.935 187 Happy Canyon Road
188.486 188 Castle Pines Parkway
189.756 190 Surrey Ridge
191.412 191 (unnamed road)
Lone Tree 192.096 192 RidgeGate Parkway Opened in May 2009
192.990 193 Lincoln Avenue
194.314 194 Colorado 470.svg SH 470 west / E-470 east – Grand Junction, Limon
195.130 195 County Line Road
Arapahoe Centennial
196.141 196 Dry Creek Road
Greenwood Village 197.188 197 Colorado 88.svg SH 88 east (Arapahoe Road) South end of SH 88 overlap
198.292 198 Orchard Road
199.384 199 Colorado 88.svg SH 88 west (Belleview Avenue) North end of SH 88 overlap
Denver Denver 200.093 200 I-225.svgI-70.svg I-225 north to I-70Limon, Aurora
201.578 201 US 285.svgColorado 30.svg US 285 / SH 30 (Hampden Avenue)
202.640 202 Yale Avenue
203.537 203 Evans Avenue
204.037 204 Colorado 2.svg SH 2 (Colorado Boulevard)
205.057 205 University Boulevard
205.919 206 Downing Street Northbound exit and southbound entrance
206.149-
206.341
206 Washington Street, Emerson Street Southbound exit and northbound entrance
206.968 207A Lincoln Street, Broadway
207.488 207B US 85.svg US 85 south (Santa Fe Drive) South end of US 85 overlap
207.641-
207.990
208 Colorado 26.svg SH 26 (Alameda Avenue) Northbound exit is via exit 207B
209.210 209A 6th Avenue east
209.210 209B US 6.svg US 6 west (6th Avenue) – Lakewood South end of US 6 overlap
209.479 209C 8th Avenue
210.310 210A US 40.svg US 40 (Colfax Avenue, I-70 Bus./US 287) – Downtown Denver
210.415 210C Colorado 33.svg SH 33 (Auraria Parkway) Northbound exit and southbound entrance
210.532 210B 17th Avenue Southbound exit (to 20th Avenue) is via exit 211
211.109 211 23rd Avenue
211.464 212 Speer Boulevard – Downtown Denver Signed as exits 212A (south) and 212B (north)
212.096 212C 20th Street
212.769 213 Park Avenue, West 38th Avenue
213.625-
213.739
214A I-70.svg I-70 (US 6 east/US 85 north) – Limon, Grand Junction North end of US 6 / US 85 overlap
Adams 213.964 214B 48th Avenue Southbound exit only
215.244 215 Colorado 58.svg SH 58 (58th Avenue)
216.301-
216.397
216 I-76.svg I-76Grand Junction, Fort Morgan, Aurora Signed as exits 216A (east) and 216B (west)
216.779 216B 70th Avenue (SH 224) Northbound exit and southbound entrance
217.006 217A US 36.svg US 36 west – Westminster, Boulder Signed as exit 217 northbound
217.006 217B I-270.svg I-270 east – Limon, Aurora Southbound exit and northbound entrance
Thornton 218.463 219 84th Avenue – Federal Heights
219.815 220 Thornton Parkway
Northglenn 221.027 221 104th Avenue – Northglenn Former SH 44
223.049 223 Colorado 128.svg SH 128 west (120th Avenue)
Thornton, Westminster
225.000 225 136th Avenue
226.085 226 144th Avenue
Adams, Broomfield Thornton, Broomfield 227.745 228 E-470 / Northwest ParkwayLimon, Broomfield
229.107 229 Colorado 7.svg SH 7Lafayette, Brighton
Broomfield Broomfield
232.094 232 Dacono, Erie
Weld
235.114 235 Colorado 52.svg SH 52Dacono, Frederick, Fort Lupton
Dacono
240.114 240 Colorado 119.svg SH 119 west – Firestone, Longmont
243.148 243 Colorado 66.svg SH 66Longmont, Lyons
Mead 245.217 245 Mead
Johnstown 250.241 250 Colorado 56.svg SH 56 west – Berthoud
252.261 252 Colorado 60.svg SH 60 east – Johnstown, Milliken
Larimer 254.216 254 Colorado 60.svg To SH 60 west – Campion Exit ramps only
255.272 255 Colorado 402.svg SH 402 west – Loveland
257.305 257 US 34.svg US 34Greeley, Loveland Signed as exits 257A (east) and 257B (west)
Loveland 259.309 259 Crossroads Boulevard Fort Collins-Loveland Airport
262.298 262 Colorado 392.svg SH 392 east – Windsor
Fort Collins 265.314 265 Colorado 68.svg SH 68 west (Harmony Road)
268.475 268 Prospect Road
269.370 269 Colorado 14.svg SH 14Ault, Fort Collins Signed as exits 269A (east) and 269B (west)
271.373 271 Mountain Vista Drive
277.884 278 Colorado 1.svg SH 1 south – Wellington
281.338 281 Owl Canyon Road
287.550 288 Buckeye Road
Weld 292.583 293 Carr

References

  1. ^ a b Colorado Department of Transportation, Highway Data, accessed October 2007: note that not every interval between mileposts is exactly a mile, explaining why more exits than expected are at the exact milepost
  2. ^ Ronald Reagan Presidential Foundation & Library
  3. ^ a b c Interstate 25
  4. ^ Sierra County Economic Development Organization. "Transportation and Highways". http://www.scedo.org/transportation.aspx. Retrieved February 2008. 
  5. ^ a b c d e Rand McNally. The Road Atlas [map]. (2006) p. 32.
  6. ^ a b c Google Maps street maps and USGS topographic maps, accessed February 2008 via ACME Mapper
  7. ^ Kuennen, Tom, ed. Interstate 50: 50 Years of the Dwight D. Eisenhower National System of Interstate and Defense Highways. 2006: Faircount. pp 118-119. ISBN unavailable.
  8. ^ Kuennen, Tom, ed. Interstate 50: 50 Years of the Dwight D. Eisenhower National System of Interstate and Defense Highways. 2006: Faircount. pp 118-119. ISBN unavailable.
  9. ^ a b Metro Denver's multi-modal T-REX takes last step - Metro Denver Economic Development Corporation
  10. ^ Kuennen, Tom, ed. Interstate 50: 50 Years of the Dwight D. Eisenhower National System of Interstate and Defense Highways. 2006: Faircount. pp 118-119. ISBN unavailable.
  11. ^ Progress of Project
  12. ^ Pikes Peak Transportation
  13. ^ CDOT | The North Forty | About
  14. ^ Kuennen, Tom, ed. Interstate 50: 50 Years of the Dwight D. Eisenhower National System of Interstate and Defense Highways. 2006: Faircount. pp 118-119. ISBN unavailable.
  15. ^ I-25 Trinidad under construction - Home
  16. ^ The New Pueblo Freeway

External links


I-25.svg Interstate 25
Previous state:
New Mexico
Colorado Next state:
Wyoming

Search unanswered questions...
Enter a question here...
Search: All sources Community Q&A Reference topics
 
 

 

Copyrights:

Wikipedia. This article is licensed under the Creative Commons Attribution/Share-Alike License. It uses material from the Wikipedia article "Interstate 25 in Colorado" Read more