Kerch |
|
| Class overview | |
|---|---|
| Builders: | 61 Kommunara Zavod Black Sea Shipyard |
| Operators: | |
| Preceded by: | Kresta |
| Succeeded by: | Udaloy / Slava |
| In service: | 1971 |
| In commission: | 1969 |
| Completed: | 7 |
| Active: | Kerch Ochakov |
| Laid up: | Petropavlovsk Vladivostok |
| Retired: | Azov |
| General characteristics | |
| Displacement: | 9,900 tons |
| Length: | 173.2 m |
| Beam: | 18.6 m |
| Draught: | 6.7 m |
| Propulsion: | 2 shaft COGAG, 4 gas turbines, 120,000 hp (88 MW) |
| Speed: | 32 knots |
| Range: | 9,000 miles |
| Complement: | 380 |
| Armament: | 2 quad SS-N-14 Silex anti-submarine missiles 2 twin SA-N-3 Goblet surface to air missile launchers (80 missiles) SA-N-4 Gecko surface to air missile launchers (40 missiles) 2 twin 76mm AK-726 dual purpose guns 4 30mm AK-630 CIWS 2 RBU-6000 anti-submarine rocket launchers 2 RBU-1000 anti-submarine rocket launchers 24 SA-N-6 Grumble surface to air missiles [on Azov] |
| Aircraft carried: | 1 Kamov Ka-25 'Hormone-A' |
The Kara is a class of Cold War era Soviet guided missile cruisers. The Soviet designation is Project 1134B Berkut B - Беркут Б (Golden Eagle) and the Soviet mission description is "large anti-submarine warfare ship" (BPK) and not "cruiser".
Design
These ships were enlarged versions of the Kresta II class, with gas turbine engines replacing the steam turbines. These ships were fitted as flagships with improved command, control and communications facilities. These are dedicated ASW ships with significant anti-aircraft capability including both SA-N-3 and SA-N-4 surface to air missiles.
The Specifications for the class were issued in 1964 with the design being finalised in the late 1960s. The gas turbine engine was chosen instead of steam for greater efficiency, quietness and because the main Soviet gas turbine plant had a long association with the Nikolayev shipyards.
The cruiser Azov was constructed as a trials ship for the SA-N-6 missile system and was also fitted with the associated Top Dome Radar. During the cold war she was confined to the Black Sea.
Ships
These ships were built by the 61 Kommunar Shipyard at Mykolaiv (Nikolayev) on the Black Sea.
| Ship | Fleet | Laid Down | Launched | Completed | Fate/Status |
|---|---|---|---|---|---|
| Nikolayev - Николаев | Black Sea | 25 June 1968 | 19 December 1969 | 31 December 1971 | scrapped in 1994 |
| Ochakov -Очаков | Black Sea | 19 December 1969 | 30 April 1971 | 4 November 1973 | Undergoing refit, Sevastopol |
| Kerch- Керчь | Black Sea | 30 April 1971 | 21 July 1972 | 26 December 1974 | Active, Black Sea Fleet, 2009 |
| Azov - Азов | Black Sea | 21 July 1972 | 14 September 1973 | 25 December 1975 | Decommissioned 28 December 1998, scrapped at Inkerman (Sevastopol) in 1999-2000 |
| Petropavlovsk - Петропавловск | Russian Pacific Fleet | 9 September 1973 | 22 November 1974 | 29 December 1976 | Sold for scrap in 1996 |
| Tashkent - Ташкент | Pacific Fleet | 22 November 1974 | 5 November 1975 | 21 December 1977 | sold for scrap in 1994 |
| Vladivostok - Владивосток - (ex Tallinn) | Black Sea Fleet | 5 November 1975 | 5 November 1976 | 31 December 1979 | sold for scrap in 1994 |
References
| Wikimedia Commons has media related to: Nikolaev class cruiser |
- Gardiner, Robert (ed.). Conway's all the World's Fighting Ships 1947-1995. London: Conway Maritime. ISBN 0851776051. OCLC 34284130. Also published as Gardiner, Robert; Chumbley, Stephen; Budzbon, Przemysław. Conway's all the World's Fighting Ships 1947-1995. Annapolis, MD: Naval Institute Press. ISBN 1557501327. OCLC 34267261.
- (Russian)Article
- (English)FAS.org
- (English)Kara Class "Kerch" Photoalbum
- (English)warfare.ru page
- (English)Global Security.org
|
|||||||||||||||||||||||||||||||||||
This entry is from Wikipedia, the leading user-contributed encyclopedia. It may not have been reviewed by professional editors (see full disclaimer)




