Share on Facebook Share on Twitter Email
Answers.com

Line 6, Beijing Subway

 
Wikipedia: Line 6, Beijing Subway

Line 6 of the Beijing Subway (simplified Chinese: 北京地铁6号线pinyin: běijīng dìtiě liùhàoxiàn) is currently under construction and is scheduled to be opened in 2012.[1] The line will run parallel to and north of Line 1 and the Batong Line, from Haidian to Tongzhou District. It may be the first of Beijing's subway lines to feature express and local stations.[2] Line 6 has a total planned length of 41.74 km with 27 stations, and will be built in two phases.

Contents

Planned Route and Stations

Construction is planned in in two phases.

A map of some of the planned lines for the Beijing Subway

Phase I

In Phase I, Line 6 will run about 30 km from Wulu in Haidian District to Caoying in Tongzhou District following Linglong Road, Sanlihe Road, Chaoyang North Rd., the west bank of the Grand Canal, and Grand Canal East Road. Of the 20 planned stations, 12 will offer transfer connections to other lines. Construction began in December 2007 and is scheduled to be completed in 2012. Total investment for Phase I is estimated at ¥19.7 billion.[3]

Planned stations from west to east (and transfer points to other lines):[3]

  1. Wulu 五路 (Line 10 Phase II)
  2. Cishousi 慈寿寺
  3. Huayuanqiao 花园桥
  4. Sidaokou 四道口 (Line 9)
  5. Erligou Dongkou 二里沟东口
  6. Chegongzhuang 车公庄 (Line 2)
  7. Ping'anli 平安里 (Line 4)
  8. Houhai West 后海西
  9. Di'anmen 地安门
  10. Longfusi 隆福寺 (Line 5)
  11. Chaoyangmen 朝阳门 (Line 2)
  12. Dongdaqiao 东大桥
  13. Hujialou 呼家楼 (Line 10)
  14. Jintai Lu 金台路
  15. Xinghuo Lu 星火路
  16. Qingnian Lu 青年路
  17. Dalianpo 褡裢坡
  18. Huangqu 黄渠
  19. Changying 常营
  20. Caofang 草房

Line 6 in Phase I was originally slated to have elevated tracks for 7 km, east of the 5th Ring Road, from Dingfuzhuang and Changying. After residents along the route raised concerns about train noise, planners reconsidered and ultimately decided to keep all of Phase I under ground.[4][5][6]

Phase II

In Phase II, Line 6 will be extended further east by about 12 km through 7 stations from Caofang to Dongxiaoying in the Tongzhou New City. Planned stations, from west to east:

  • Beijing Wuzi University 物资学院
  • Beiguan Roundabout 北关环岛
  • Xinhua Dajie 新华大街
  • Yudaihe Dajie 玉带河大街
  • Haojiafu 郝家府
  • Eastern New City 东部新城
  • Dongxiaoying 东小营

Notes


Search unanswered questions...
Enter a question here...
Search: All sources Community Q&A Reference topics
 
 

 

Copyrights:

Wikipedia. This article is licensed under the Creative Commons Attribution/Share-Alike License. It uses material from the Wikipedia article "Line 6, Beijing Subway" Read more