| NS8 Marsiling MRT Station 马西岭地铁站 மார்சிலிங் Stesen MRT Marsiling Rapid transit |
|||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
A train departing Marsiling MRT Station. |
|||||||||||
| Station statistics | |||||||||||
| Address | 71 Woodlands Avenue 3 Singapore 739044 |
||||||||||
| Coordinates | 1°25′57.49″N 103°46′27.42″E / 1.4326361°N 103.7742833°E | ||||||||||
| Lines | |||||||||||
| Connections | Bus, Taxi | ||||||||||
| Structure | Elevated | ||||||||||
| Levels | 2 | ||||||||||
| Platforms | Island | ||||||||||
| Tracks | 2 | ||||||||||
| Other information | |||||||||||
| Opened | 10 February 1996 | ||||||||||
| Accessible | |||||||||||
| Code | NS8 | ||||||||||
| Operator | SMRT Trains (SMRT Corporation) | ||||||||||
| Services | |||||||||||
|
|||||||||||
| Location | |||||||||||
Marsiling MRT Station (NS8) is an above-ground Mass Rapid Transit station on the North South Line in Singapore. The station is located in Woodlands.
|
Contents
|
The government came up with a proposal to build the Woodlands extension in 1990 with the aim of extending the then existing North-South and East-West lines, thus connecting Choa Chu Kang in the West to Yishun in the North. Marsiling was one of the four stations in the initial proposal which was later expanded to six. Construction commenced in 1991 and the station was opened on 10 February 1996.[1]
Following numerous incidents of commuters falling on the tracks and unauthorized intrusions, the Land Transport Authority made the decision in 2008 to install half height platform screen doors for all above-ground stations in phases. HHPSDs started operation from December 22, 2011 with Admiralty.[2]
Due to the station's proximity to neighbouring Housing and Development Board apartment blocks, a privacy screen was built along the tracks at the side of the station (southbound platform) facing these apartment blocks for privacy.[citation needed]
| L2 | Platform A | North South Line towards NS1 EW24 Jurong East (→) |
|
|
||
| Platform B | North South Line towards NS27 CE2 Marina Bay via NS9 Woodlands (←) |
|
| L1 | NSL Concourse | Faregates, Ticketing Machines, Station Control |
| Street Level | ||
| Destination | First Train | Last Train | |||||
|---|---|---|---|---|---|---|---|
| Mon - Fri | Sat | Sunday & Public Holiday |
Daily | ||||
| North South Line | |||||||
| to NS1 Jurong East | 5.41am | 5.40am | 6.04am | 12.38am | |||
| to NS27 Marina Bay | 5.24am | 5.24am | 5.41am | 11.12pm | |||
| to NS19 Toa Payoh | - | - | - | 11.48pm | |||
| to NS16 Ang Mo Kio | - | - | - | 12.37am | |||
| to NS7 Kranji | - | - | - | 12.55am | |||
| This Singapore MRT-related article is a stub. You can help Wikipedia by expanding it. |
This entry is from Wikipedia, the leading user-contributed encyclopedia. It may not have been reviewed by professional editors (see full disclaimer)