|
Grey Line
|
|
|---|---|
| Overview | |
| Type | Monorail |
| System | Bangkok MRT |
| Status | proposed - cancelled |
| Locale | Bangkok, Thailand |
| Termini | Vatcharapol Rama 9 Bridge |
| Stations | 21 (planned) |
| Operation | |
| Opened | 2029 (est.) |
| Owner | Mass Rapid Transit Authority of Thailand |
| Operator(s) | MRT |
| Technical | |
| Line length | 26 kilometers (16 mi) (est.) |
| Electrification | Third rail ? |
| Operating speed | 80 km/h (50 mph) ? |
The MRT Grey Line (Vatcharapol - Lat Phrao - Rama IV - Rama IX Bridge) is one of the planned metro routes in Bangkok, Thailand. Its path runs along the north - south axis. This line is to support the growth of residential areas around Pradit Manutham Rd. and the Sathupradit area in Yan Nawa District. The route runs from Ram Indra Road, on the northeast outskirts of Bangkok, down south through Pradit Manuthum Rd. along the Chalongrat Expressway going into the downtown district of Thong Lo. From there, it passes through Sukhumvit Rd., Rama IV Rd., and Ratchadapisek - Rama 3 Rd. It ends at The Rama IX Bridge in the south of the downtown Bangkok. The total distance of the route is approximately 26 km and is expected to service 340,000 passengers per day. The project and construction is expected to terminate in the year of 2029.
|
Contents
|
The new Yingluck Shinawatra led government, who replaced the Abhisit Vejjajiva led government, has decided not to pursue plans to continue the MRT Grey Line and the MRT Light Blue Line, citing that the lines are not feasible within their 4 years 10 lines rush plan and that if the Bangkok Metropolitan Administration plan to pursue it, the BMA must find funding on its own. [1]
The route has a total of 21 planned stations.
| Code | Station Name | Number of train platforms | Transfer | |
|---|---|---|---|---|
| Watcharaphon - Lat Phrao | ||||
| Watcharaphon | MRT Pink Line: Watcharaphon (planned) | |||
| Nuan Chan | ||||
| Kaset Nawamin | ||||
| Yothin Phatthana | ||||
| Lat Phrao 87 | ||||
| Lat Phrao - Rama IV | ||||
| Chalong Rat | MRT Yellow Line: Chalong Rat (planned) | |||
| Nawasi | MRT Orange Line: Nawasi (planned) | |||
| Rama IX | ||||
| Sun Wichai | SRT Light Red Line: Sun Wichai (planned) | |||
| Thong Lo 25 | ||||
| Thong Lo 10 | ||||
| Thong Lo | BTS Sukhumvit Line: Thong Lo | |||
| Sukhumvit 38 | ||||
| Rama IV | ||||
| Khlong Tan (Kasem Rat Intersection, Khlong Toei District) | ||||
| Rama IV - Rama IX Bridge | ||||
| Ratchada-Rama IV | ||||
| Khlong Toei (Na Ranong Intersection) | ||||
| Rama III | ||||
| Narathiwat Ratchanakharin | ||||
| Sathu Pradit | ||||
| Rama IX Bridge | ||||
|
|||||||||||||||||||
| This article related to the city of Bangkok, Thailand is a stub. You can help Wikipedia by expanding it. |
| This article about rail transport in Thailand is a stub. You can help Wikipedia by expanding it. |
This entry is from Wikipedia, the leading user-contributed encyclopedia. It may not have been reviewed by professional editors (see full disclaimer)