MRT Grey Line

Share on Facebook Share on Twitter Email
Top
     Grey Line
Overview
Type Monorail
System Bangkok MRT
Status proposed - cancelled
Locale Bangkok, Thailand
Termini Vatcharapol
Rama 9 Bridge
Stations 21 (planned)
Operation
Opened 2029 (est.)
Owner Mass Rapid Transit Authority of Thailand
Operator(s) MRT
Technical
Line length 26 kilometers (16 mi) (est.)
Electrification Third rail ?
Operating speed 80 km/h (50 mph) ?
Route map
Unused urban interchange head
Vatcharapol BSicon exTRAM.svg
Unknown BSicon "uexBHF"
Nuan Chan
Unknown BSicon "uexBHF"
Kaset Nawamin
Unknown BSicon "uexBHF"
Yothin Phatthana
Unknown BSicon "uexBHF"
Lat phrao 87
Unknown BSicon "uexINT"
Chalong Rat BSicon exTRAM.svg
Unknown BSicon "uexINT"
Nawasi BSicon exTRAM.svg
Unknown BSicon "uexBHF"
Rama 9
Unknown BSicon "uexINT"
Sun Wichai
Unknown BSicon "uexBHF"
Thong Lo 25
Unknown BSicon "uexBHF"
Thong Lo 10
Unknown BSicon "uexINT"
Thong Lo
Unknown BSicon "uexBHF"
Sukhumvit 38
Unknown BSicon "uexBHF"
Rama 4
Unknown BSicon "uexBHF"
Khlong Tan
Unknown BSicon "uexBHF"
Ratchada Rama 4
Unknown BSicon "uexBHF"
Khlong Toei
Unknown BSicon "uexBHF"
Rama 3
Unknown BSicon "uexBHF"
Narathiwat
Unknown BSicon "uexBHF"
Sathupradit
Unknown BSicon "uexKBHFe"
Rama 9 Bridge

The MRT Grey Line (Vatcharapol - Lat Phrao - Rama IV - Rama IX Bridge) is one of the planned metro routes in Bangkok, Thailand. Its path runs along the north - south axis. This line is to support the growth of residential areas around Pradit Manutham Rd. and the Sathupradit area in Yan Nawa District. The route runs from Ram Indra Road, on the northeast outskirts of Bangkok, down south through Pradit Manuthum Rd. along the Chalongrat Expressway going into the downtown district of Thong Lo. From there, it passes through Sukhumvit Rd., Rama IV Rd., and Ratchadapisek - Rama 3 Rd. It ends at The Rama IX Bridge in the south of the downtown Bangkok. The total distance of the route is approximately 26 km and is expected to service 340,000 passengers per day. The project and construction is expected to terminate in the year of 2029.

Contents

Progress

The new Yingluck Shinawatra led government, who replaced the Abhisit Vejjajiva led government, has decided not to pursue plans to continue the MRT Grey Line and the MRT Light Blue Line, citing that the lines are not feasible within their 4 years 10 lines rush plan and that if the Bangkok Metropolitan Administration plan to pursue it, the BMA must find funding on its own. [1]

Station

The route has a total of 21 planned stations.

List of Planned Stations

Code Station Name Number of train platforms Transfer
Watcharaphon - Lat Phrao
Watcharaphon MRT Pink Line: Watcharaphon (planned)
Nuan Chan
Kaset Nawamin
Yothin Phatthana
Lat Phrao 87
Lat Phrao - Rama IV
Chalong Rat MRT Yellow Line: Chalong Rat (planned)
Nawasi MRT Orange Line: Nawasi (planned)
Rama IX
Sun Wichai SRT Light Red Line: Sun Wichai (planned)
Thong Lo 25
Thong Lo 10
Thong Lo BTS Sukhumvit Line: Thong Lo
Sukhumvit 38
Rama IV
Khlong Tan (Kasem Rat Intersection, Khlong Toei District)
Rama IV - Rama IX Bridge
Ratchada-Rama IV
Khlong Toei (Na Ranong Intersection)
Rama III
Narathiwat Ratchanakharin
Sathu Pradit
Rama IX Bridge

Transfers

References

See also



Post a question - any question - to the WikiAnswers community:

Copyrights: