The Nelson River Bipole is a historic electric power transmission system of two high voltage, direct current lines in Manitoba, operated by Manitoba Hydro as part of the Nelson River Hydroelectric Project. It is now recorded on the list of IEEE Milestones [1] in electrical engineering.
The system transfers electric power generated by several hydroelectric power stations along the Nelson River in Northern Manitoba across the wilderness to the populated areas in the south. It includes two rectifier stations, Radisson Converter Station near Gillam at 56°21′41″N 94°36′48″W / 56.36139°N 94.61333°W and Henday Converter Station near Sundance at 56°30′14″N 94°08′24″W / 56.50389°N 94.14°W, one inverter station, Dorsey Converter Station at Rosser (26 km from Winnipeg at49°59′34″N 97°25′42″W / 49.99278°N 97.42833°W), and two sets of high-voltage direct current transmission lines, each with two parallel overhead conductors to carry the positive and negative feeds. Both bipolar systems have extensive ground return electrodes to allow use in monopolar mode.
Contents |
Bipole 1
Bipole 1 runs 895 km from Radisson to Dorsey. It is rated to run at a maximum potential difference of ±450 kilovolts and a maximum power of 1620 megawatts. This results in a electric current of 3600 Amperes. When it was built between March 1971 and October 1977, mercury arc valves were used to rectify the alternating current. These were the most powerful mercury arc valves ever built. In 1993 the mercury arc valves of one pole were replaced with thyristors, increasing the maximum power and voltage of the line to its current levels. By the end of 2004 the last of the mercury arc valves had been replaced by thyristors.
Bipole 2
The Bipole 2 transmission line runs 937 km from Henday to Dorsey. Bipole 2 can transfer a maximum power of 1800 MW at a potential of ±500 kV. Bipole 2 was put into service in two stages. After the first stage in 1978 the maximum power was 900 MW at 250 kV, which increased to its present figure when it was completed in 1985. Unlike Radisson station, Henday station has always been equipped with thyristors.
Electrodes
Bipole 1 and 2 share a ring electrode with 305 metres diametre 21.9 kilometres away from Dorsey Converter Plant. At Radisson Bipole 1 uses a ground electrode of same type 11.2 kilometres away from the station. Bipole 2 uses a ground electrode with 548 metres diametre is 11.2 kilometres away from Henday Converter Plant at 56°26'2"N 94°13'22"W. The electrodes are connected with the corresponding converter plants with an overhead powerline fixed on wooden poles. The electrode at Dorsey Converter Plant is connected with Dosey Converter Plant by two overhead powerlines, one for Bipole 1 and one for Bipole 2.
| Please help improve this article by expanding it. Further information might be found on the talk page. (December 2009) |
History
Construction in 1966 of the 1272 MW Kettle Rapids generating station required a long transmission line to connect it to load centers in the southern part of Manitoba. The Government of Canada agreed to finance installation of an HVDC line to be repaid by Manitoba Hydro when the load growth permitted the utility to assume the debt due to the line. Delivery of direct current electric power began on June 17, 1972.
One unit of the Kettle generating station was completed before the direct current converters were completed.[2] For the winter of 1970 the bipole lines were energized with alternating current, contributing a useful amount of energy to the Manitoba system; a shunt reactor was installed to prevent excess voltage rise due to the Ferranti effect.
At that time, Bipole I used the world's highest operating voltage to deliver the largest amount of power from a remote site to a city, and employed the largest mercury arc valves ever developed for such an application. The line required construction of over 3,900 guyed towers and 96 self supporting towers across varied terrain. Permafrost in some areas led to foundation settling of up to 3 feet (1 m).
The loan by the Government of Canada was discharged when Manitoba Hydro bought the line and outstanding debt in 1992 [3]. In 1997 a tornado damaged 19 towers of the DC lines. During repairs, some major customers were advised to curtail load, but imports over the 500 kV lines from adjacent utilities in the United States prevented serious interruption of power.
A third such line, called Bipole 3 has been proposed, with current plans calling for it to run along the west side of Manitoba. On October 26, 2009, the Canadian Taxpayers Federation, along with engineering and environmental experts, released analysis which they claimed refuted each of the government's claims for why the line must be built down the west side of the province.
External links
- Manitoba Hydro
- Canadian Taxpayers Federation
- http://web.archive.org/web/20051115122606/www.transmission.bpa.gov/cigresc14/Compendium/NELSON1.htm
- http://web.archive.org/web/20051115122606/www.transmission.bpa.gov/cigresc14/Compendium/NELSON2.htm
- http://web.archive.org/web/20051115122606/www.transmission.bpa.gov/cigresc14/Compendium/Nelson2%20Pictures.pdf
References
- ^ IEEE History Center: Nelson River HVDC Transmission System, 1972 retrieved June 30, 2008
- ^ Leonard A. Bateman, An Engineering Career in the Hydroelectric Industry, Engineering Institute of Canada Working Paper 22/2004, July 2004
- ^ L. A. Bateman, "A History of Electric Power Development in Manitoba", in IEEE Canadian Review, Winter 2005
This entry is from Wikipedia, the leading user-contributed encyclopedia. It may not have been reviewed by professional editors (see full disclaimer)