| CC4 DT15 Promenade MRT Station 宝门廊地铁站 புரொமனெட் Stesen MRT Promenade Rapid transit |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dhoby-Ghaut-Bound Platform level of Promenade MRT Station. |
|||||||||||||||||||||
| Station statistics | |||||||||||||||||||||
| Address | 2 Temasek Avenue 10 Temasek Avenue Singapore 039193/ 039194 |
||||||||||||||||||||
| Coordinates | 1°17′35″N 103°51′40″E / 1.293131°N 103.861064°E | ||||||||||||||||||||
| Lines | |||||||||||||||||||||
| Connections | Bus, Taxi | ||||||||||||||||||||
| Structure | Underground | ||||||||||||||||||||
| Levels | 5, 2 (U/C) | ||||||||||||||||||||
| Platforms | Stacked Side | ||||||||||||||||||||
| Tracks | 4, 2 (U/C) | ||||||||||||||||||||
| Other information | |||||||||||||||||||||
| Opened | 17 April 2010 (Circle Line) | ||||||||||||||||||||
| Accessible | |||||||||||||||||||||
| Code | CC4 / DT15 | ||||||||||||||||||||
| Operator | SMRT Trains (SMRT Corporation) - Circle Line SBS Transit (ComfortDelGro Corporation) - Downtown Line |
||||||||||||||||||||
| Services | |||||||||||||||||||||
|
|||||||||||||||||||||
| Location | |||||||||||||||||||||
Promenade MRT Station (CC4/DT15) is an underground Mass Rapid Transit station in Singapore, located along Temasek Avenue, near the Millennia Walk shopping mall.[1] It is the fourth station along the counter-clockwise-bound Circle Line track. The station was opened on 17 April 2010 along with the rest of Stage 1 & 2 of the Circle Line. As of 19 February 2011, the Circle Line Extension tunnel has been opened up. From 14 January 2012, this station now interchanges with the Circle Line Extension.
In the future, this station will be an interchange with the Downtown Line. The Promenade MRT Station is within the urban planning area of the Downtown Core. The station at the Downtown Line side will be the deepest when it is completed, at 43 metres deep.
This station is also where the Circle Line forks into two branches - one branch towards the part of the Downtown Core southwest of the River towards Marina Bay via Bayfront with an expected extension towards HarbourFront to complete the circle and the other towards stations in the part of the Downtown Core northeast of the river (Bras Basah, Esplanade and Dhoby Ghaut stations).
|
Contents
|
| L1 | Street Level | Millenia Walk |
| B1 | Concourse | Faregates, Ticketing Machines, Station Control |
| B2 |
|
|
| Platform B | Circle Line towards CC1 NS24 NE6 Dhoby Ghaut or CE2 NS27 Marina Bay (←) |
|
| B3 | Service Level | Restricted Access |
| B4 |
|
|
| Platform A | Circle Line towards CC29 NE1 HarbourFront or CC6 Stadium (→) |
|
| B5 | Concourse | Faregates, Ticketing Machines, Station Control, Transfer linkway between Circle Line and Downtown Line platforms |
| B6 |
|
|
| Platform B | Downtown Line (under construction) towards DT19 NE4 Chinatown (←) |
|
| B7 |
|
|
| Platform A | Downtown Line (under construction) towards DT14 EW12 Bugis (→) |
|
| Destination | First Train | Last Train | ||||
|---|---|---|---|---|---|---|
| Mon - Sat | Sunday & Public Holiday |
Daily | ||||
| Circle Line | ||||||
| to CC1 Dhoby Ghaut | 5.50am | 6.17am | 11.59pm | |||
| to CC29 HarbourFront | 5.43am | 6.10am | 11.54pm | |||
| to CC26 Pasir Panjang | - | - | 11.24pm | |||
| to CC23 one-north | - | - | 11.40pm | |||
| to CC17 Caldecott | - | - | 12.08am | |||
| to CC11 Tai Seng | - | - | 12.15am | |||
| to CE2 Marina Bay | 6.15am | 6.35am | 11.48pm | |||
| Downtown Line | ||||||
| to DT14 Bugis | - | - | - | |||
| to DT19 Chinatown | - | - | - | |||
Train services between Marina Bay and Promenade stations along the Circle Line was disrupted on Jan 19 2012 at 12.08pm. SMRT said the problem was due to a signalling equipment on the track that failed. Train services resumed at 12.40 pm. SMRT provided free bus bridging services between the three affected stations during the disruption. [2]
This entry is from Wikipedia, the leading user-contributed encyclopedia. It may not have been reviewed by professional editors (see full disclaimer)