Share on Facebook Share on Twitter Email
Answers.com

South Forty-Foot Drain

 
Wikipedia: South Forty-Foot Drain
South Forty-Foot Drain
{{{alt}}}
The South Forty-Foot Drain at Pointon, between Boston and Guthrum Gowt. Here its origin as a drainage channel is very evident.
Original Owner Black Sluice Commissioners
Principal Engineer Earl of Lindsay
Date of Act 1765
Date of first use 1846
Date Completed 1770
Date Closed 1971
Date Restored March 2009
Maximum Boat Length 70 ft 0 in (21.34 m)
Maximum Boat Beam 20 ft 0 in (6.10 m)
Start Point The Haven, Boston
End Point Guthram Gowt
Locks 1


(1 or 2 more locks will be required when the drain is joined to the River Glen)

Maximum Height above sea level -1 ft (−0.30 m)
Status Under restoration
Navigation Authority Environment Agency
South Forty Foot Drain
uSTRrg uJUNCrd BSicon .svg
The Haven, Boston
uxABZrf uFGATEu BSicon .svg
Boston Lock
uxKRZun uKRZun BSicon .svg
London Road bridge
uxSLUICEbl uSTR BSicon .svg
Black Sluice Pumping Station
uexSTRlf ueABZlg BSicon .svg
BSicon .svg uAROADu BSicon .svg
A16 Spalding Road bridge
uexSTRq uSTRbl BSicon .svg
North Forty Foot Drain (Cooks Lock PS)
BSicon .svg uSTRbr uexSTRlg
Chain Bridge PS
BSicon .svg uSTR uexABZlf
Old Hammond Beck
BSicon .svg uSTR uexSTRlf
New Hammond Beck
BSicon .svg uAROADu BSicon .svg
A52 bridge
BSicon .svg uKRZuy BSicon .svg
B1192 Hubbert's Bridge
uexSTRq uSTRbl BSicon .svg
Clay Dike and Holland Fen PS
uexSTRq
uexSTRq
Skerth Drain (Swineshead PS)
BSicon .svg uAROADu BSicon .svg
A17 Station Road, Swineshead
uexSTRq uSTRbl BSicon .svg
Great Hale Eau (Great Hale PS)
BSicon .svg uSTRbr uexSTRq
Mill Drain (Bicker Fen PS)
uexSTRq ueABZrf BSicon .svg
Helpringham Eau
uexSTRq uSTRbl BSicon .svg
Engine Drain (Helpringham Fen PS)
BSicon .svg umKRZu BSicon .svg
Sleaford - Spalding Railway bridge
BSicon .svg uSTRbr uexSTRq
Donington North Ing PS
uexSTRq ueABZrf BSicon .svg
uexSTRq uSTRbl BSicon .svg
Twenty Foot Drain (Swaton PS)
uexSTRq ueABZrf BSicon .svg
Swaton Eau
BSicon .svg uTRANSf BSicon .svg
Widening required below here
BSicon .svg uAROADu BSicon .svg
A52 Donington High Bridge
BSicon .svg uSTRbr uexSTRq
Mallard Hurn PS
uexSTRq uSTRbl BSicon .svg
Horbling Fen PS
uexSTRq ueABZrf BSicon .svg
Ouse Mere Lode
uexSTRq uSTRbl BSicon .svg
Billingborough PS
BSicon .svg uSTRbr uexSTRq
Quadring Fen PS
uexSTRq ueABZrf BSicon .svg
Billingborough Lode
BSicon .svg uKRZun BSicon .svg
Neslam Bridge
uexSTRq uSTRbl BSicon .svg
Semperingham Lode (Semperingham PS)
uexSTRq ueABZrf BSicon .svg
Pointon Lode
uexSTRq
uexSTRq
Dowsby Fen PS / Gosberton PS
BSicon .svg uSTR BSicon .svg
(Ten and Twenty Foot Drains)
BSicon .svg uKRZuy BSicon .svg
B1397 Kingston's Bridge
uexSTRq uSTRbl uexSTRq
Dowsby Lode PS
BSicon .svg uSTR BSicon .svg
(Dowsby Drain / Higher Lode)
uexSTRq uSTRbl BSicon .svg
Rippingale Fen PS
uexSTRq ueABZrf BSicon .svg
Rippingale Running Dike
BSicon .svg uKRZun BSicon .svg
Caswell's Bridge
uexSTRq uSTRbl BSicon .svg
Dunsby Fen PS
BSicon .svg uSTRbr uexSTRq
Star Lode (Pinchbeck North Fen PS)
uexSTRq uSTRbl BSicon .svg
Hacconby Fen PS
uexSTRq uxSLUICEbl BSicon .svg
Lane Dike (Black Hole Drove PS)
uexSTRq ueABZrf BSicon .svg
Morton Drain
uxHSTRbm ueABZrf BSicon .svg
New Dike (Dyke Fen PS)
uxHSTRbm ueABZrf BSicon .svg
Engine Drain (Twenty Corner PS)
BSicon .svg uAROADu BSicon .svg
A151 Bourne Road bridge
uexSTRrg
BSicon .svg
Fens Link phase 2
uexSTR
uSTRq
River Glen to Spalding
uexSTR uSTRfr BSicon .svg
Guthram Gowt
uexSTR uSTR BSicon .svg
Weir Dike and River Glen
uexSTR uxABZlf uSTRlg
Tongue End Jn
uexSTR uxSLUICEbl uSTR
Tongue End Pumping Station
uxWEIRr ueABZrf
Weir Dike
uexSTRq uexSTRrf uexSTR
Bourne Eau
BSicon .svg BSicon .svg uxKRZun
Long Drove bridge, Tongue End
BSicon .svg BSicon .svg uexSTR
River Glen
BSicon .svg BSicon .svg BSicon .svg
(PS : Pumping Station)
The Holland Fen pumping station, which pumps water from Clay Dike into the South Forty-Foot Drain

The South Forty-Foot Drain is the main channel for the land-drainage of the Black Sluice Level in the Lincolnshire Fens. It lies in eastern England between Guthram Gowt and the Black Sluice pumping station on The Haven, at Boston. The Drain has its origins in the 1630s, when the first scheme to make the Fen land available for agriculture was carried out by the Earl of Lindsay, and has been steadily improved since then. Water drained from the land entered The Haven by gravity at certain states of the tide until 1946, when the Black Sluice pumping station was commissioned.

The Drain was navigable until 1971, when improvements to the pumping station led to the entrance lock being removed. It is currently being upgraded to navigable status by the Environment Agency, as part of the Fens Waterways Link, with the new entrance lock being completed in December 2008, and the upgrading of the southern section, including a link to the River Glen to allow navigation to Spalding forming phase 2 of the project.

Contents

History

The Lincolnshire Fens are an area of low-lying land which have been subject to flooding and attempts to prevent it for centuries. In medieval times, the Midfen Dyke was built to drain the area, but by 1500, this was regarded less as a drain for the land than as a boundary marker between the Parts of Holland and the Parts of Kesteven, two of the three medieval subdivisions of Lincolnshire which functioned as county councils until their abolition in 1974. The first serious attempt to drain the area to the south west of Boston, now known as the Black Sluice Area but formerly known as the Lindsay Level, was from 1635 to 1638, when the Earl of Lindsay agreed with the Commissioners of Sewers for Lincolnshire to carry out drainage works which would make 36,000 acres (150 km2) of land available for agricultural use. The Earl and his colleagues paid for the works, in return for land grants.[1]

The cost of the work was £45,000, and involved the construction of a sluice near Boston, called Skirbeck Sluice, the construction of the first 8 miles (13 km) of the South Forty-Foot Drain, from Boston to Great Hale, the construction of two drains from there to Guthram, which were called the Double Twelves, and the construction of the Clay Dyke Drain. The scheme was not popular with local landowners, who destroyed much of the work and burnt the Skirbeck Sluice. The Earl of Lindsay's contract with the Commissioners of Sewers was revoked by parliament, and it was another hundred years before the next attempt to drain the area.[1]

In an attempt to drain Holland Fen, and prevent flooding from the River Witham, an adventurer called Earl Fitzwilliam constructed a drain in 1720, which runs broadly parallel to the River Witham, and terminated at Lodewick's Gowt, a sluice which he constructed on the Witham close to the location of the present Grand Sluice. The drain was for many years called Earl Fitzwilliam's drain, but is now called the North Forty-Foot Drain. The scheme was not entirely successful.[2]

Second Sluice

In 1762, the Witham Act was passed by Parliament, and among other things constituted the Commissioners of Sewers for the Second and Sixth District, which covered the area including Asgarby, Ewerby, Great Hale, Heckington, Holland Fen, Howell, Little Hale and South Kyme. Much of the area was inundated by the Great Flood of 1763, and against this background, an Act of Parliament was obtained in 1765 which created the Black Sluice Commissioners, giving them power to raise taxes and authority to carry out drainage works. The scheme largely revived the Earl of Lindsay's original scheme. A new sluice, called the Black Sluice, was built at Boston as a direct replacement for the Skirbeck Sluice, while the South Forty-Foot Drain was scoured from Boston to Great Hale, and extended by 13 miles (21 km) to Guthram. A total of 65 miles (105 km) of highland streams were improved by scouring and raising of the banks. The estimated cost of £16,000 was raised by issuing bonds, but the project overran, and another Act of Parliament was obtained in 1770 to authorise the raising of the drainage taxes, to cover the difference.[1]

On the River Witham, the Grand Sluice was constructed and opened on 15 October 1766, and this prevented tidal water from entering the river, and hence flooding the Holland Fen. The Boston Harbour Commissioners were created by the Boston Port Act of 1766, and they carried out improvement works to The Haven, which resulted in lower water levels at the Black Sluice, and hence more efficient draining from the South Forty-Foot Drain. Water was pumped into the drain by a series of windmills driving scoop wheels. Maps of the area produced in 1783 by Edward Hare show 46 such mills, which provided drainage for 32,000 acres (130 km2) of agricultural land. Extreme high tides in 1810 and again in 1820 resulted in widespread flooding, and further thought was given to improving the flood defences.[1]

With the improvements to the River Witham, the final section of Earl Fitzwilliam's drain to Lodewick Gowt was filled in, and the channel was diverted to join the South Forty-Foot Drain. Renamed the North Forty-Foot Drain, it now supplies Cooks Lock and Holland Fen pumping stations.[2]

Third Sluice

Reports on improvements to the system were produced in 1843 by the surveyor Mr W Lewin and in 1845 by Sir John Rennie. Rennie's scheme involved the provision of a catchwater drain to collect water draining from the higher ground to the west before it entered the fenlands, but an Act of Parliament to authorise its construction was defeated, and so in 1846 a report by Mr W Cubit which proposed improvements to the existing infrastructure was accepted by the Commissioners. A new Black Sluice, including a 20-foot (6.1 m) navigation lock, was constructed to the south of the original one, with the cill level 6 feet (1.8 m) lower, which enabled the gradient of the South Forty-Foot Drain to be increased to 3 inches per mile (5 cm/km). Many of the tributary drains were also improved. 1846 also marked the beginning of the use of steam engines for pumping. Ten years later, a map covering 18,000 acres (73 km2) of the Black Sluice area showed nine steam-powered and eight wind-powered drainage engines in use.[1]

The River Witham Outfall Improvement Act of 1880 authorised further improvements to the mouth of the Witham, to which the Black Sluice Commissioners contributed £65,000. This work led to a further drop of 4 feet (1.2 m) in the low water level at the Black Sluice. Oil and paraffin engines began to replace steam and wind engines from 1910, and by 1935 there were 15 such engines pumping water into the South Forty-Foot Drain. The passing of the Land Drainage Act in 1930 resulted in the Commissioners being replaced by the Black Sluice Internal Drainage Board,[1] while responsibility for the rivers in the area passed to the Witham and Steeping Rivers Catchment Board.[2] With war imminent, the Rivers Board took over the Black Sluice and the South Forty-Foot Drain in 1939, and although progess was interrupted by the Second World War, a £374,000 scheme to construct the Black Sluice pumping station and to widen 11 miles (18 km) of the drain from Boston to Donington Bridge was completed in 1946.[1] The pumping station contained three 100-inch (2.5 m) pumps, each powered by a 900-horsepower (670 kW) 5-cylinder vertical diesel engine manufactured by Ruston.[2]

Modern era

Paraffin and oil engines gave way to electrically powered pumping stations in the 1950s, with the Board constructing six electric and one diesel pumping station to improve drainage to an extra 11,000 acres (45 km2) of land. In 1960, the decision was taken to further improve drainage of an area of 70,000 acres (280 km2), as part of a £1.4 million scheme which included the addition of two extra pumps at the Black Sluice, replacement of existing pumps elsewhere, and the widening of 7 miles (11 km) of the South Forty-Foot Drain from Donington Bridge to Rippingale Running Dyke. Jurisdiction for the Drain and the sluice passed to the Lincolnshire River Board at this time. The work, which began in 1962 and was completed in 1968, proved successful in preventing flooding during severe wet weather in the winter of 1968/9.[1] With three 900-horsepower (670 kW) and two 925-horsepower (690 kW) diesel engines, the upgraded pumping station can pump 800 thousand gallons per minute (60 m3/s). Responsibility for the drain and the sluice passed to the National Rivers Authority in 1990, and to the Environment Agency in 1995.[2]

Despite all the improvements, serious flooding occurred in 1999 when the bank of the drain was breached near Pinchbeck. Staff from the Environment Agency and the Black Sluice Internal Drainage Board successfully repaired the breach before properties were flooded, and a review of the flood defences was then carried out. The report recommended improvements to some of the banks, but funding for the work was not available, and so no work was done at the time.[3]

Functions

Black Sluice pumping station at Boston, where the Drain meets The Haven

The South Forty-Foot Drain serves as a district boundary over the length where it runs roughly south to north. South of Donington High Bridge, the Drain separates South Kesteven to the west from South Holland to the east. The boundary then continues southwards along the River Glen. North of Donington, the boundary between the borough of Boston to the east and North Kesteven to the west follows the line of the Drain. As the Drain crosses the line of the Midfen Dyke, just before the Nottingham to Boston railway joins it at Great Hale pumping station, the boundary turns northwards, following its medieval course.

The main job of the Drain is to gather the waters pumped from the Kesteven Fens, the Holland Fens and the Weir Dyke, a soak dike in Bourne North Fen, alongside the Bourne Eau and River Glen, northwards and eastwards to the Black Sluice at Boston, where they are discharged to the tidal waters of The Haven. The Weir Dyke takes its name from a weir in the bank of the Bourne Eau at Tongue End, which was constructed by the Black Sluice Commissioners, to allow water from the Bourne Eau to overflow the bank when excess water could not flow into the River Glen in times of flood.[4] The overfall weir became redundant when the Tongue End pumping station was constructed in 1966.[1]

The South Forty-Foot Drain and the Black Sluice pumping station, together with most of the side channels which run into the drain are the responsibility of the Environment Agency. Management of the drainage ditches which drain the Fens are the responsibility of the Black Sluice Internal Drainage Board, who maintain 34 pumping stations and three gravity stations in the region.[5] Of these, 21 are situated on the banks of the Drain, and pump directly into it, while one, the Black Hole Drove pumping station, is constructed over the channel, and acts as a boundary between the part of the Drain managed by the Environment Agency, and that managed by the Drainage Board.[6]

Navigation

The new lock at Black Sluice, allowing navigation from The Haven to the Drain

Prior to 1971, the Drain had been navigable, but this privilege was removed at that time. It is unclear whether there was ever a right of navigation, or whether the Black Sluice Commissioners simply allowed it. The entrance lock was 72 by 20 feet (22 m × 6.1 m), and most trade was between Boston and Donnington Bridge, with pleasure boating not being allowed prior to 1962. The lock was closed and removed in 1971,[7] with little protest being made. More recently, the East Anglian Waterways Association promoted the idea that the Drain could again be made navigable as part of a larger scheme to improve leisure facilities. The local authorities which were part of the Fens Tourism consortium conducted a feasibility study, and this report was formally adopted as the Fens Waterways Link by the Environment Agency in 2004, with the support of the local authorities, the East Anglian Waterways Association and the Inland Waterways Association.[8]

The scheme involves a total of 150 miles (240 km) of waterway, of which 50 miles (80 km) will be new cruiseway, while the rest will be existing waterways which will be upgraded or have their access improved. When completed, it will connect the Rivers Witham, Glen, Welland, Nene and Great Ouse, and is being heralded as the biggest waterway enhancement project in Europe by the Environment Agency.[9] In 2007 they obtained funding for the link between Boston and Spalding. Work on a new lock beside the Black Sluice pumping station at Boston - to connect The Haven and the South Forty-Foot Drain - was formally started on 8 February 2008,[10] and was completed in December 2008, with the official opening ceremony being held on 20 March 2009.[11] The lock project formed phase 1 of the scheme, and the cost of £8.5 million was jointly funded by the European Regional Development Fund, the East Midlands Development Agency, and Lincolnshire County Council. The lock is designed to be used for a period either side of high tide, and so there is a rise from the Drain to the Haven. It has conventional mitre gates at one end, but uses rotating sector gates at the tidal end, each one weighing 12.1 tonnes.[12]

The lock opens up nearly 12 miles (19 km) of waterway. As part of the upgrade, new 48-hour moorings have been constructed on The Haven, for boats about to enter the Drain, and on the South Forty-Foot Drain near the Black Sluice pumping station at Boston,[11] at Swineshead Bridge and at Hubbert's Bridge.[13] The upper limit of navigation is initially Donington High Bridge, at which the Swaton Eau joins the South Forty-Foot Drain and provides a wider section where boats can be turned. Beyond the bridge, the drain is officially only suitable for canoes and kayaks.[14] However, eight narrow boats cruised on the waterway at Easter 2009, and although the channel is narrower and not as deep after Donington Bridge, all of the boats successfully reached Kingston's Bridge, some 3.7 miles (6.0 km) further on, where the outlets from Dowsby Fen and Gosberton pumping stations provide enough width to turn a 70-foot (21 m) boat. Further progress was blocked by scaffolding erected so that the bridge could be re-decked, rather than by lack of water.[15]

The drain has been renamed as the Black Sluice Navigation by the Environment Agency. In order to use the navigation, an Environment Agency licence is required, and as there are no permanent moorings available on the drain, these are available for one day or seven days. [14] Water levels are maintained at a lower level during the winter months, when flows are high, and the Drain needs to be able to cope with higher volumes of rainfall, than during the summer months, when navigable levels are maintained. As on the neighbouring River Witham, the switch between winter and summer levels is normally made at the beginning of April.[11]

Phase 2 of the Fens Waterway project involves the link between Donington Bridge and Crowland and Cowbit Washes, which are located on the River Welland near Spalding. In order to make the financing of the phase more viable, it has been split into two halves, with phase 2a covering the section from Donington to Surfleet Seas End on the River Glen, and phase 2b covering from there onwards.[11] The initial technical assessment and obtaining of planning permission for phase 2, which involves widening of the South Forty-Foot Drain from Donington to a new road crossing under the A151, a new lock and a junction with the River Glen at Guthram Gowt was funded by the East Midlands Development Agency.[16] This section will also involve changes at Black Hole Drove pumping station, which has been built across the drain and hence would prevent navigation.[8] Major contracts for this phase were expected to be awarded in April 2009.[11]

Route



See also

References

  1. ^ a b c d e f g h i Staff. "History of the Draining of the Fens in the Black Sluice Area". The Black Sluice Internal Drainage Board. http://www.blacksluiceidb.gov.uk/history.html. Retrieved 18 December 2008. 
  2. ^ a b c d e Sly, Rex (2003). From Punt to Plough - A History of the Fens. Stroud, England: Sutton Publishers. ISBN 978-0-7509-3398-8. 
  3. ^ "Future plans for the Black Sluice area". Black Sluice Internal Drainage Board. http://www.blacksluiceidb.gov.uk/future-plans.html. Retrieved 18 December 2008. 
  4. ^ Miles, W. D. (1976). A History of the Drainage of Bourne South Fen and Thurlby Fen. Welland and Deepings IDB. 
  5. ^ "Pumping Stations". The Black Sluice Internal Drainage Board. http://www.blacksluiceidb.gov.uk/pumping-stations.html. Retrieved 18 December 2008. 
  6. ^ "Map of the Area". The Black Sluice Internal Drainage Board. http://www.blacksluiceidb.gov.uk/images/board-map.jpg. Retrieved 18 December 2008. 
  7. ^ "Fens Waterway Link, Navigation Appendix, page 14". Environment Agency. http://www.fenswaterways.com/portals/0/docs/nav_appendix.pdf. Retrieved 16 January 2009. 
  8. ^ a b "Fens Waterway Link". The Inland waterways Association. http://www.waterways.org.uk/Restoration/NewWaterwaysUnderConstructionorPlanned/FensWaterwayLink. Retrieved 18 December 2008. 
  9. ^ "Fens Waterways Link". Environment Agency. http://www.fenswaterways.com/. Retrieved 19 December 2008. 
  10. ^ Head Office Bulletin - Issue 134. IWA. March 2008. 
  11. ^ a b c d e Newsletter 17. Lincolnshire Waterways Partnership. November 2008. 
  12. ^ Newsletter 18. Lincolnshire Waterways Partnership. March 2009. 
  13. ^ "New moorings for the South Forty Foot". Environment Agency. http://www.environment-agency.gov.uk/news/100765.aspx?month=12&year=2008. Retrieved 21 March 2009. 
  14. ^ a b "Black Sluice Navigation - a guide for river users". Environment Agency. http://www.fenswaterways.com/Portals/0/docs/navigation_guides/Black_Sluice_Navigation_Guide.pdf. Retrieved 5 July 2009. 
  15. ^ Pioneering voyage on Boston's new waterway. Waterways World. June 2009. 
  16. ^ Newsletter 15. Lincolnshire Waterways Partnership. March 2008. 

Coordinates: 52°50′58″N 0°16′33″W / 52.8494°N -0.27571°E / 52.8494; -0.27571


Search unanswered questions...
Enter a question here...
Search: All sources Community Q&A Reference topics
 
 

 

Copyrights:

Wikipedia. This article is licensed under the Creative Commons Attribution/Share-Alike License. It uses material from the Wikipedia article "South Forty-Foot Drain" Read more