A reduced level is the vertical distance between a survey point
and the adopted level datum. There are two methods for calculating
reduced levels, namely the "rise and fall" method and the "height
of collimation" method. The latter reduces levels relative to the
instrument height. As it has inferior built-in checks, it is
unreliable.