Thameslink

 
Wikipedia: Thameslink
 v  d  e Thameslink
BSicon .svg BSicon .svg CONTg BSicon .svg BSicon .svg
Midland Main Line to Leeds
BSicon .svg BSicon .svg BHF BSicon .svg BSicon .svg
Bedford
BSicon .svg BSicon .svg TUNNEL1 BSicon .svg BSicon .svg
Ampthill Tunnel (715 yards)
BSicon .svg BSicon .svg eHST BSicon .svg BSicon .svg
Ampthill
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Flitwick
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Harlington
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Leagrave
BSicon .svg BSicon .svg BHF BSicon .svg BSicon .svg
Luton
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Luton Airport Parkway BSicon FLUG.svg
BSicon .svg BSicon .svg eHST BSicon .svg BSicon .svg
Chiltern Green
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Harpenden
BSicon .svg BSicon .svg BHF BSicon .svg BSicon .svg
St Albans City
BSicon .svg BSicon .svg eHST BSicon .svg BSicon .svg
Napsbury
BSicon .svg BSicon .svg AKRZ-UKo BSicon .svg BSicon .svg
M25 motorway
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Radlett
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Elstree & Borehamwood
BSicon .svg BSicon .svg TUNNEL1 BSicon .svg BSicon .svg
Elstree Tunnel (1072 yards)
BSicon .svg BSicon .svg AKRZ-UKu BSicon .svg BSicon .svg
M1 motorway
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Mill Hill Broadway
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Hendon
BSicon .svg BSicon .svg eHST BSicon .svg BSicon .svg
Welsh Harp
BSicon .svg BSicon .svg HST BSicon .svg BSicon .svg
Cricklewood
BSicon .svg BSicon .svg INT BSicon .svg BSicon .svg
West Hampstead Thameslink London Underground London Overground
BSicon .svg BSicon .svg eHST BSicon .svg BSicon .svg
Finchley Road
BSicon .svg BSicon .svg TUNNEL1 BSicon .svg BSicon .svg
Belsize Tunnel (1771 yards)
BSicon .svg BSicon .svg TUNNEL1 BSicon .svg BSicon .svg
Lismore Circus Tunnel (88 yards)
BSicon .svg BSicon .svg eHST BSicon .svg BSicon .svg
Haverstock Hill
BSicon .svg BSicon .svg INT BSicon .svg BSicon .svg
Kentish Town London Underground
BSicon .svg BSicon .svg TUNNEL1 BSicon .svg BSicon .svg
Camden Road Tunnel (308 yards)
BSicon .svg BSicon .svg eHST BSicon .svg BSicon .svg
Camden Road (Midland)
BSicon .svg STRrg ABZrf BSicon .svg BSicon .svg
Midland Main Line
BSicon .svg ABZrg KRZu CONTr BSicon .svg
North London Line/ECML/HS1
BSicon .svg STR TUNNELa BSicon .svg BSicon .svg
St Pancras International London Underground
BSicon .svg CPICle
BSicon .svg BSicon .svg
Kings Cross Tunnel (1704 yards)
BSicon .svg BSicon .svg TUNNELe BSicon .svg BSicon .svg
King’s Cross Thameslink
BSicon .svg BSicon .svg eHST BSicon .svg BSicon .svg
(closed December 2007)
BSicon .svg BSicon .svg TUNNEL1 BSicon .svg BSicon .svg
Clerkenwell Tunnels 1, 2 & 3
BSicon .svg BSicon .svg INT BSicon .svg BSicon .svg
Farringdon London Underground
BSicon .svg BSicon .svg eABZlf exSTRq exSTRlg
BSicon .svg BSicon .svg TUNNELa BSicon .svg exTUNNELa
Snow Hill Tunnel (770 yards)
BSicon .svg BSicon .svg teABZrg extSTRq texABZlg
Smithfield Tunnel (292 yards)
Snow Hill
BSicon .svg BSicon .svg etHST BSicon .svg exTUNNELe
City Thameslink
BSicon .svg BSicon .svg tHST BSicon .svg extHST
Barbican (Closed March 2009) London Underground
BSicon .svg BSicon .svg TUNNELe BSicon .svg exTUNNELa
Holborn Viaduct (closed 1990)
BSicon .svg BSicon .svg eABZrg exKBHFr extSTR
Barbican Tunnel (690 yards)
Ludgate Hill
BSicon .svg BSicon .svg eHST BSicon .svg exTUNNELe
Blackfriars London Underground London River Services
BSicon .svg BSicon .svg INT BSicon .svg extKBHFe
Moorgate (Closed March 2009) London Underground
Blackfriars Railway Bridge
BSicon .svg BSicon .svg WBRÜCKE BSicon .svg BSicon .svg
River Thames
Blackfriars Bridge
BSicon .svg BSicon .svg eHST BSicon .svg BSicon .svg
BSicon .svg STRrg ABZrl STRlg BSicon .svg
Borough Road
BSicon .svg eHST BSicon .svg STR BSicon .svg
Elephant & Castle London Underground
BSicon .svg INT BSicon .svg INT BSicon .svg
London Bridge London Underground London River Services
Walworth Road
BSicon .svg eHST BSicon .svg STR BSicon .svg
Camberwell
BSicon .svg eHST BSicon .svg STR BSicon .svg
Loughborough Junction
BSicon .svg HST BSicon .svg STR BSicon .svg
Herne Hill
BSicon .svg HST BSicon .svg STR BSicon .svg
Tulse Hill
BSicon .svg HST BSicon .svg STR BSicon .svg
BSicon .svg ABZlf STRq ABZlg BSicon .svg
Leigham Tunnel (302 yards)
BSicon .svg TUNNEL1 BSicon .svg STR BSicon .svg
Streatham Tunnel (220 yards)
BSicon .svg TUNNEL1 BSicon .svg STR BSicon .svg
Streatham
BSicon .svg HST BSicon .svg STR BSicon .svg
BSicon .svg ABZlf STRq ABZlg BSicon .svg
STRrg ABZrl STRlg STR BSicon .svg
Tooting
HST BSicon .svg HST STR BSicon .svg
Mitcham Eastfields
Tooting Junction
eHST BSicon .svg STR STR BSicon .svg
Haydons Road
HST BSicon .svg INT STR BSicon .svg
Mitcham Junction Tramlink
Wimbledon London Underground Tramlink
INT BSicon .svg HST STR BSicon .svg
Hackbridge
Wimbledon Chase
HST BSicon .svg HST STR BSicon .svg
Carshalton
South Merton
HST BSicon .svg HST STR BSicon .svg
Sutton
Morden South
HST BSicon .svg HST STR BSicon .svg
West Sutton
St. Helier
HST BSicon .svg HST STR BSicon .svg
Sutton Common
STRlf STRq STRrf INT BSicon .svg
East Croydon Tramlink
BSicon .svg BSicon .svg BSicon .svg TUNNEL1 BSicon .svg
Merstham tunnels (2013, 2113 yards)
BSicon .svg BSicon .svg BSicon .svg AKRZ-UKo BSicon .svg
M25 motorway
BSicon .svg BSicon .svg BSicon .svg BHF BSicon .svg
Redhill
BSicon .svg BSicon .svg BSicon .svg HST BSicon .svg
Gatwick Airport BSicon FLUG.svg
BSicon .svg BSicon .svg BSicon .svg HST BSicon .svg
Three Bridges
BSicon .svg BSicon .svg BSicon .svg TUNNEL1 BSicon .svg
Balcombe tunnel (1168 yards)
BSicon .svg BSicon .svg BSicon .svg HST BSicon .svg
Balcombe
BSicon .svg BSicon .svg BSicon .svg HST BSicon .svg
Haywards Heath
BSicon .svg BSicon .svg BSicon .svg TUNNEL1 BSicon .svg
Haywards Heath Tunnel (249 yards)
BSicon .svg BSicon .svg BSicon .svg HST BSicon .svg
Wivelsfield
BSicon .svg BSicon .svg BSicon .svg HST BSicon .svg
Burgess Hill
BSicon .svg BSicon .svg BSicon .svg HST BSicon .svg
Hassocks
BSicon .svg BSicon .svg BSicon .svg TUNNEL1 BSicon .svg
Clayton Tunnel (2259 yards)
BSicon .svg BSicon .svg BSicon .svg TUNNEL1 BSicon .svg
Patcham Tunnel (488 yards)
BSicon .svg BSicon .svg BSicon .svg HST BSicon .svg
Preston Park
BSicon .svg BSicon .svg BSicon .svg KBHFe BSicon .svg
Brighton
The Thameslink route is operated with a fleet of 78 dual-voltage Class 319 electric multiple units.

Thameslink is a fifty-station route in the British railway system running 225 km (140 mi) north to south from Bedford to Brighton through the Snow Hill tunnel in Central London. It is an important commuter route and also serves the airports at London Gatwick and London Luton. No other only main line traverses central London, within which it resembles a local underground line, with stations similar to those of the sub-surface Circle line, and peak-hour trains between St. Pancras and Blackfriars at four-minute intervals. In late 1998, more than 28,000 passengers were carried at morning peak times.[1] Most of the route is over the Brighton Main Line and the southern part of the Midland Main Line. There is also a suburban loop through Sutton and Wimbledon.

Upon the privatisation of British Rail the operation of Thameslink services was franchised to a subsidiary of Govia, the train operating company Thameslink. From 1 April 2006 it was taken over by First Capital Connect along with other services previously operated by WAGN.[2] The branding of most trains, stations, and signs has been changed to match the name of the new company, but City Thameslink and West Hampstead Thameslink stations keep the word Thameslink in their names as it refers to the route itself.[3] After criticism of the loss of the apt name for this group of routes, First Capital Connect's publicity now calls this set of services its "Thameslink route" to distinguish it from the former WAGN services which the company also operates.

Contents

History

The route across London existed since mid-Victorian times. Passenger services were cut back during World War 1 to terminate at Moorgate from the Midland line to the north, and at Holborn Viaduct for SE&C trains from the south, as most of the inner cross-London traffic had been lost to buses and trams. However the route remained operational for cross-London freight trains until 1970, just lasting into the diesel era, when the short section between Farringdon and Holborn Viaduct was closed. There were separate lower level platforms under the main part of Holborn Viaduct station known as the Snow Hill platforms, and these can still be seen today when leaving City Thameslink station travelling northwards.

The Snow Hill tunnel was re-opened to passenger trains after 72 years in 1988 and this allowed timetabled cross-London services to begin on the full Thameslink network in May 1988.[4]

Before that, overhead electrification completed in 1982 allowed the northern section to run as the Midland City Line service from Bedford via the Midland Main Line to London St Pancras. and via the City Widened Lines to Moorgate.[5] From the south, services terminated at Holborn Viaduct.

From north to south the central London stations are: St Pancras International for connections to Eurostar and the East Midlands; Farringdon, which links into the London Underground’s Circle, Metropolitan and Hammersmith & City lines; City Thameslink[6] which replaced the demolished Holborn Viaduct but also has a southern entrance serving Ludgate Circus; Blackfriars, which links to a number of other rail services and the District and Circle lines on the Underground; and London Bridge, which also links to a number of other lines. King's Cross Thameslink on Pentonville Road closed on 8 December 2007.

In the south there are two branches. The main line runs through London Bridge to East Croydon, then to Brighton. A second branch has a more convoluted history.

To begin with, trains went via Bromley to Orpington and Sevenoaks. Some time after that, the non-Brighton trains ran via Elephant & Castle and Streatham to West Croydon. Although this route, still used by other train services, comes close to the "main line", it never relinks with it. After West Croydon the line ran through Carshalton Beeches to Sutton then to Epsom, Leatherhead, and Effingham Junction, finally terminating at Guildford. However, this route crossed the commuter networks of what were to become several different rail companies and the onset of rail privatisation made the route increasingly difficult to maintain. Around 1994 the second branch was cut back to West Croydon. Then around 1995 a major overhaul occurred when the route was changed completely. Thameslink no longer served the West Croydon route and instead a new route to Sutton was opened up over existing track through Mitcham Junction with the line then continuing on a loop up to Wimbledon and then rejoining itself south of Streatham. It should be noted, however, that morning peak trains only run in a clockwise direction around this loop, which is a major source of inconvenience for commuters in this area.

Thameslink Programme (Thameslink 2000)

From 1991 successive railway authorities (British Rail, Railtrack, Network Rail) proposed to upgrade the Thameslink network to cope with increasing passenger numbers which in recent years have led to severe peak overcrowding. Initially called Thameslink 2000, the project is known as the Thameslink Programme.[7] After a planning process which began in November 1997 Network Rail obtained planning permission and legal powers on 18 October 2006,[8] and funding for the work was approved on 24 July 2007.[9] Construction began on 24 October 2007, with Luton Airport Parkway the first station to be extended. The provisional completion date is 2015.[10][11]

Rolling stock

The Thameslink rolling stock is mainly the entire fleet of 86 Class 319 trains built by BREL between 1987 and 1990. These are electrically powered dual-voltage four-car units rated to carry 289, 308 or 319 passengers. They use 25 kV AC overhead power north of Farringdon and 750 V DC third rail to the south. Four Class 319 trains had been transferred from Southern in December 2008 and the last four followed in March 2009, from which point all 86 Class 319 trains were available for use on Thameslink.

First Capital Connect acquired 23 new-build four-coach Class 377 trains during 2009, on sublease from Southern to be used on the Thameslink route for additional capacity and also to allow some of the Class 319 trains to be released for use on the Catford Loop service to Orpington and Sevenoaks which is jointly operated with Southeastern under Key Output 0 of the Thameslink Programme.[12]

Class 317 units built in the early 1980s were still in use when services into Moorgate (25 kV AC) ceased in March 2009 under the Thameslink Programme. The last timetabled service consisting of a single Class 317 unit operating the 18:19 service from Farringdon to Bedford on week days only, ended on Friday 09/10/2009.

New energy-efficient trains will provide an additional 14,500 seats on the Thameslink route and will be delivered from 2012 to 2015.[13]

In July 2009, the Department for Transport announced that depots for the new rolling stock would be built at Hornsey and Three Bridges.

See also

  • Crossrail, a Under Construction East–West line, also through central London

Footnotes and References

  1. ^ Strategic Rail Authority (29 March 1999). "Sustained Passenger Growth in London". Press release. http://nds.coi.gov.uk/environment/fullDetail.asp?ReleaseID=181549&NewsAreaID=2&NavigatedFromDepartment=False. Retrieved 17 June 2008. 
  2. ^ Central Office of Information News Distribution Service (13 December 2005). "Department of Transport announces winner of Thameslink/GN franchise". Press release. http://nds.coi.gov.uk/environment/fullDetail.asp?ReleaseID=181549&NewsAreaID=2&NavigatedFromDepartment=False. Retrieved 17 June 2008. 
  3. ^ King’s Cross Thameslink also kept the Thameslink suffix until it closed on 8 December 2007.
  4. ^ "Station Name: Snow Hill/Holborn Viaduct Low Level". Disused Stations News. Subterranea Britannica. 8 December 2007. http://nds.coi.gov.uk/environment/fullDetail.asp?ReleaseID=181549&NewsAreaID=2&NavigatedFromDepartment=False. Retrieved 17 June 2008. 
  5. ^ This service was colloquially known as the Bedpan Line from the contracted names of the terminal stations, as had happened with the Bakerloo line. In general, limited-stop trains served St Pancras, and all-station services terminated at Moorgate.
  6. ^ City Thameslink was called St. Paul's Thameslink when it opened on 29 May 1990. It was renamed in 1991 to avoid confusion with St. Paul's station on the London Underground (Central Line), which is about 500 m (550 yd) away on the opposite side of St Paul's Cathedral.
  7. ^ Network Rail. "Thameslink Programme". http://www.networkrail.co.uk/aspx/1326.aspx. Retrieved 18 October 2006. 
  8. ^ Network Rail (18 October 2006). "The £3.5bn Thameslink Project clears major hurdle". http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=2408&NewsAreaID=2&SearchCategoryID=2. Retrieved 18 October 2006. 
  9. ^ Coward, Andy (15-28 August 2007). "Cross-river rail to boost Capital". Rail 572: 40–3. 
  10. ^ "Work begins on Thameslink project". BBC News (bbc.co.uk). 24 October 2007. http://news.bbc.co.uk/1/hi/england/london/7059432.stm. Retrieved 24 October 2007. 
  11. ^ Network Rail (24 October 2007). "£5.5bn Thameslink Programme gets under way at Luton". Press release. http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=3389&NewsAreaID=2&SearchCategoryID=2. Retrieved 24 October 2007. 
  12. ^ They will also run the peak hour Bedford to Ashford/Medway town trains as 8 car trains. The first of the new class 377/5 trains started running on the Thameslink route on 24 March 2009. "Do we really have to wait until 2012 and 2015 for some relief to the overcrowding?". First Capital Connect (thameslinkprogramme.co.uk). 20 October 2008. http://www.thameslinkprogramme.co.uk/index.php/faqs/faqs_categories/public_index#question_29. Retrieved 28 October 2008. 
  13. ^ "Thameslink gets 14,500 more seats". BBC News (bbc.co.uk). 9 April 2008. http://news.bbc.co.uk/1/hi/england/london/7338401.stm. Retrieved 1 June 2008. "The deal, announced by Transport Secretary Ruth Kelly, will mean the current 720-carriage Thameslink fleet increasing by 380 carriages. A contract for the new carriages is expected to be awarded in summer 2009, with the first train in service by 2012." 

External links


Search unanswered questions...
Enter a question here...
Search: All sources Community Q&A Reference topics
 
 
Learn More
The Go-Ahead Group Plc
Keolis SA
King's Cross Thameslink railway station

Help us answer these
How to get from London Thameslink Station to Kings X mainline station?
Who will finance the infrastructure and the train for Thameslink 2000?