answersLogoWhite

0


Best Answer

Gun Digest is usually your best bet for a general value on almost any fire arm. The Ranger that you are refering to is a Model 520 made for Sears and Roebuck. It was a John Browning design made by Stevens. Made between 1927 and 1939. These guns are valued between $75 and $125.

User Avatar

Wiki User

โˆ™ 2006-02-16 05:44:53
This answer is:
User Avatar
Study guides

Add your answer:

Earn +20 pts
Q: How do you determine the date of manufacture and value of a Ranger Browning design pump 12 gauge?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the manufacture date of FN - Browning design SXS 12 GA shotgun serial no 28021?

You will have to call Browning.


What is the purpose for a manufacture company to have a branding design?

The purpose for a manufacture company to have a branding design is clearly depict the website as a strong brand in its field and to opimize the website with a modern design.


Why do you design before manufacture?

It's handy for the makers to have design specs and plans.


How does size determine structure in organizational design?

how does size determine structure in organizational design?


What career uses 3d nets?

People who design and manufacture containers and machines which manufacture containers.


What does Autostrada design and manufacture?

Autostrada design and manufacture a wide range of vehicles especially a feature called "cruise control" for car makes such as Ford, Mazda and Suzuki.


When did john browning invent the Browning high power?

I can say that john brownings last design was produced in 1935 for the first time.


What country makes the most smartphones?

Design - America Manufacture - China


What does CIM mean in design technology?

it means 'computer individual manufacture'


How is modern technology use in food production?

Design and manufacture Design of packaging Measurements of grams by computer on an industrial scale


Innovation in supply chain management?

The innovation in supply chain management has the 3 cycles in sourcing. These are Design for assembly,Design for manufacture, Design for product serviceability, Design for environment,Design for Six Sigma.


What are general responsibilties for areospace engineers?

To design, manufacture, and test aviation components

People also asked