It took 4 years i did a report on this bridge my answer is right
Construction began on January 5, 1933 and the first pedestrians crossed the bridge on May 27, 1937. The first cars crossed on May 28, 1937.
The Golden Gate Bridge started construction in 1933 by Joseph B. Strauss and his helpers. It was finished in 1937.
Construction on the bridge started on January 5, 1933 and was completed on May 27, 1937.
Construction of the Golden Gate Bridge took more than four years, from January 1933 to April 1937.
February 1967 to August 1969.
5 yrs
15 years
4.5 years
15 years
9
The Golden Gate Bridge is 1,966 yards long.
Golden Gate Bridge
The Golden Gate is the narrow channel connecting the San Francisco Bay to the Pacific Ocean. It was named the Golden Gate by John C Frèmont on 1 July, 1846. The golden Gate bridge, however, is the suspension bridge connecting San Francisco and Marin County that crosses over the Golden Gate.
You are the Golden Gate Bridge.
it's 1.7 miles
Golden Gate Bridge But I'm Not Sure Cause It Might Be A Different Bridge Well it depends on what your reffering to long, wide, fat? Because there are a lot of bridges that are big.
the golden gate bridge was on the top of the list for at least 20 years
The Brooklyn Bridge is 5,989 feet long. The George Washington Bridge is 4,760 feet long.
It takes a bloody long time to paint.
it was made out of strong tools
The Golden Gate span is about 1280 meters (4200 feet). Or 1.28 kilometers.
The Golden Gate Bridge is painted red, but called Golden because of the sun. Its steel cables are long enough to circle the Earth three times! If the US Navy had its way, the bridge might have been painted in black and yellow strips, for ships to see it clearly. Over 1,200 suicides have occurred from jumping off the bridge. The Golden Gate Bridge is the most photographed bridge in the entire world.