Want this question answered?
Be notified when an answer is posted
The common term for measuring land is surveying.
it doesn't have a fixed length, as long as a rod is "grounded" connected to the ground by a heavy duty wire, it's a lightning rod. . .
I own a surveying company and for a Tech surveyor you can expect around $60,000 and as a Licensed survey around $80,000+ Australian Dollars
A boundary is marked during the surveying stage. This is a very important step because it lets contractors know how much land they have to work with.
survey the land or entire area with surveying equipment, look at previously recorded survey data from over the years, compare your findings with those previously taken, to see what the rate of subsidence is for the area.
The University of Florida offers classes in land surveying.
One chain is equal to 66 survey feet.
Land surveying is mapping out land for land development. Hydrographic surveying is mapping bodies of water. Engineering is a type of surveying that has to do with buildings roads and other man made things.
polar
it is read in tenths of a foot, engineers scale
geomatics differ with surveying in that it encompasses a broad range of disciplines than surveying,let alone surveying is a discipline under geomatics
This process is known as surveying.
The common term for measuring land is surveying.
linear land survey is too good
The prismatic compass is a type of compass use for survering a land.
iron pin
Trigonometry is basically formula's to help you find out unknown sides and angles of a triangle. Surveying is measuring land. But as not all land is equal so these formula's are used to help.