1 + 2 + 4 = 7divide one kg by 7then multiple each item by that answer1 part cement is 1/7 of the kg (5.0428 ounces)2 part sand is 2/7 of the kg (10.0857 ounces)4 part stone is 4/7 of the kg (20.1714 ounces)kg equals 2.205 pounds, so you are not going to make very much concrete using only one kg!
1 ounce
Wet concrete is approximately 150 pounds per cubic foot. So 80 pounds is approximately 1/50 th of a cubic yard.
1 bar = 100000 Pa1psi = 6890 Paapprox 14.5psi to the barPrecisely,1 bar =14.5037738 psipsi = pounds per square inch
Assuming you wish to used bagged 'pre-mixed' concrete, the industry standard is 1/2 cubic foot yield from a 60 pound bag. Keep in mind that the true weight will vary due to such things as sand/portland/aggregate ratios. But for a simple answer, you will be close with 3240 pounds. 60 pounds per 1/2 cubic foot, = 120 pounds for each cubic foot. 27 cubic ft. per yard 120 X 27 = 3240
11 pounds and 1 ounce.
1 Ounce=0.0625 Pounds 1 Pound= 16 Ounces
1 ounce = 0.0625 pounds 208 ounces = 13.0 pounds
There are 0.0625 pounds per ounce.1 ounce = 0.0625 pounds1 Ounce = 0.0625 Pounds.0625
.83 pounds mass is equal to 13.28 ounce mass .83 pounds force is equal to 13.28 ounce force
2 & 1 fourth pounds equals how many ounces
There are 16 ounces in 1 pound.
1 ounce = 0.0625 pounds.
2.4 pounds. There are 16 ozs. in one pound.
1/8 ounces = 3.544 grams = 0.007813 pounds
512 Ounces is equal to 32 Pounds. 1 Ounce = 0.0625 Pounds 512 Ounces * 0.0625 Pounds = 32 Pounds
16 ounces = 1 pound 1 ounce = 1/16 pound