about 6600000 tons of concrete!!
natal
40,000 tunes
13,200,000,000 pounds of concrete
677666555 was used
Hoover dam used 6,600,000 tons of concrete so you could build 2 Hoover dams and have some left over to be exact 800,000 tons left over.
The volume of concrete used to build the Millau bridge is 85,000 m3 (cubic meters). The weight of this volume of concrete is 206,000 metric tons.
No one knows the exact amount of concrete used to build I-90. However, it did cost 1 billion dollars to build.
no
among others, concrete, seel, dynomite, and construction cranes. sorry, can't think of any more off the top of my head.
They used concrete.
Three and one-quarter million cubic yards. There are 4,360,000 cubic yards of concrete in the dam
Concrete does dry as it solidifies, but the water used in the mix does not evaporate and leave the remaining components of the concrete in place as a solid. When concrete sets the water chemically reacts with the solids and is incorporated into the now solid material. The main problem with the setting of the concrete in Hoover Dam was to remove the heat generate in the setting process. The concrete was poured in such thick blocks that the internal temperature would have risen to damaging levels without special procedures to remove this heat. Coolant was circulated through pipes laid in the concrete to remove this heat.
Concrete, glass, wood and steel were used to build the Calgary tower.
The average cost of making a concrete garage depend greatly on the size of the garage, materials used, and whether you build it yourself or hire a contractor. The average cost to build a concrete garage ranges from around $13,000 for a very small garage to as much as $45,000 for a large, custom concrete garage.
5,000,000 barrels of cement were used to make the 4,300,000 cubic yards of concrete required.
Concrete, stone and steel.