how would a temperature reading be different if the thermometer were over unshaded asphalt
At high temperatures such as 275F (135C), asphalt is a Newtonian fluid. At low temperature, asphalt is a non-Newtonian fluid.
4.2 J/g-K
I usually load slow cure cutback asphalt cement between 70-75 degrees celsius for shipping.
You can lay asphalt any season as long as the air and the ground temperature are in the proper range. below a certain temp it's a definite no-no.
The volume is 2 359,737 216 cm3. The mass of the asphalt is depending on the density (M = V x d). Each grade of asphalt (bitumen) has a different density and can contain different additives; also the density is dependent on temperature. Generally the density is approx. 1 g/cm3, therefore the mass of the above mentioned asphalt may be approx. 2,3 kg at 20 0C.
There isn't a good way to tile over asphalt. Because of temperature changes, asphalt expands and contracts on a regular basis and this will cause the tile to crack. Also, tile will allow water to get through and cause a problem with freezing between the asphalt and the tiles.
Asphalt cement is an amorphous polymer, which makes defining the melting point difficult. It's more common to refer to the glassy-transition temperature and the softening temperature. The glassy-transition temperature of asphalt cement is between -35 °C to -10 °C and the softening point ranges from 30 °C to 150 °C. While these temperatures vary for each asphalt, exact values an be determined with a DSC test and the ring and ball test respectfully.
At high temperatures, the asphalt will become less viscous and more like a free-flowing liquid. At low temperatures, it will solidify.
asphalt leaves rock sticking up just a small amount where as concrete is smoother
There are no curing time requirement for prime coat. You can asphalt rigth away after your prime as long as the prime have the proper temperature. There are curing time for TACK COAT which is different. (TACK IS OVER ASPHALT,PRIME IS OVER BASE ROCK ).Is a common mistake confuse those two different operations. The curing time for TACK depend of the weather and varie between 8 hrs to 24 hrs. Gustavo Cuenca Civil Engineer.
It will not adhere.
block cracks