Direct labor are not part of overhead costs and shown separately while indirect labor are part of overhead costs and included in overhead cost because those labor cannot be allocated separately or identifiable separately.
Using direct labor hours: Overhead rate = Total Overhead Expenses /Direct labor hours Using Machine hours: Overhead rate = Total Overhead Expenses /Machine hours
Indirect labor is part of overhead costs and included in total product cost.
Prime cost basically is the cost of direct labor and cost of direct material; whereas conversion costs is Overhead cost and direct labor cost.
Overhead refers to the cost of a business in a particular period. Specifically, overhead points to fixed and indirect costs. They are non-labor costs. Non-labor costs are variable or fixed. Rent and salaries are examples of fixed costs. Advertising and supplies are variable costs.
The two categories of cost comprising conversion costs are direct labor and factory overhead
Factory manager is not directly related to the production of units of product so it is not direct labor cost but it is included in overhead costs.
Predetermined overhead rate based on direct labor cost = Budgeted overhead cost / direct labor cost / 100 Predetermined overhead rate based on direct labor cost = budgeted overhead cost / direct labor hours.
it is direct labor plus overhead costs
1 - Raw material cost 2 - Direct labor cost 3 - Overhead Cost
Using direct labor hours: Overhead rate = Total Overhead Expenses /Direct labor hours Using Machine hours: Overhead rate = Total Overhead Expenses /Machine hours
Indirect labor is part of overhead costs and included in total product cost.
work in process
Prime cost basically is the cost of direct labor and cost of direct material; whereas conversion costs is Overhead cost and direct labor cost.
Formula for prime cost = direct material + direct laborFormula for conversion cost = direct labor + manufacturing overheads
B. Direct materials, direct labor, and variable manufacturing overhead.
Predetermined overhead rate = Est. total Manuf. Overhead Cost / Est. total amt of allocation base In this case, allocation base would be direct labor (as opposed to machine labor). Hope this helps
Yes. True.