answersLogoWhite

Top Answer
User Avatar
Wiki User
Answered 2013-06-02 23:08:42

The current (1973) bridge is a pre-stressed concrete box girder bridge

001
๐Ÿ™
0
๐Ÿคจ
0
๐Ÿ˜ฎ
0
๐Ÿ˜‚
0
User Avatar

Your Answer

Still Have Questions?

Related Questions

Construction Materials used to build London Bridge?

Pre-stressed concrete.


How did they build london bridge?

The first London Bridge was built around 50AD by the Romans.


What material did they build the London bridge out of?

The current London Bridge is a pre-stressed concrete box girder bridge.


How long did it take to build the tower of london bridge?

London Bridge doesn't have any towers. You may be thinking about Tower Bridge which took about six years to build.


What materials were used to build the London Bridge?

The present London Bridge is a pre-stressed concrete box girder bridge.


What materials were used to build London Bridge?

The current London Bridge is made of pre-stressed concrete.


What was the material to build London bridge?

iron


How long did it take to build London bridge?

This depends on which London Bridge is meant. There were various wooden and stone bridges that preceded the current London Bridge. The original London Bridge, which featured an intricate complex of houses, shops and a chapel, 19 small arches and a drawbridge with a gatehouse at each end, took 33 years to construct (1176-1209). This was replaced by a new bridge which took six years to build (1825-1831). Construction of the most recent London Bridge was begun in 1967 before the previous bridge was removed (and which now resides in Arizona), so took around five years to build, being completed in 1972.


Why did the Romans build the London bridge?

To cross the River Thames in London.


How many people did it take to build the Tower Bridge?

It took 450 people to build the London Tower Bridge!


How much did it cost to build the London Bridge?

about 1.99people


When did Romans build first London bridge?

About AD50


What material where used to build the London bridge?

wht


Was it hard to build the London bridge?

yes my grand dad helped build it


What material do the use to build the London bridge?

The current London Bridge, built in 1973, is a pre-stressed concrete structure.


How much did London bridge cost to construct?

It Took round about 9.9 Trillion Pounds tto build the London Bridge.


Songs with the word bridge in it?

Bridge Over Troubled Water Which Bridge to Cross and Which Bridge to Burn Love Can Build A Bridge View from a Bridge Cross that Bridge Graffiti Bridge Bridge Washed Out On London Bridge London Bridge is Falling Down


What stone was used to build London Bridge?

The present bridge is a pre-stressed concrete box girder bridge.


What year was tower bridge build in London?

It was completed in 1894


How many people did it take to build London bridge?

Ten


How much did it cost to build London bridge?

About 9.9 trillion


How long it take to build the Brooklyn bridge?

Construction of the Brooklyn Bridge started on the Second of January of 1870 on the Brooklyn side of the East River, with the construction of the Brooklyn-side bridge-towerits construction was finished in 1883prasangax@gmail.com


How long did the London bridge take to build?

The current bridge was built between 1968 and 1973.


How long did it take to build the London bridge in London?

London Bridge was being built between 1967 aand 1972 and was opened officially on 17th March 1973.


How do you build a bridge-?

To build a bridge, firstly you have to see what kind of a bridge is suitable for the particular place, it can be a wooden bridge or cemented etc. Secondly, before starting you have get a model made with the collaboration of a construction company for a proper balanced bridge.


Still have questions?