A subfloor is a base floor for main floor like if you are willing to have under floor heating system then a floor is built first then the main flooring is made so basicall base floor of main floor is subfloor.
subfloors are generally made from at least two layers of moisture resistant ('AC' grade, one side finished and sanded flat) plywood or composite sheeting.
A subfloor is the base floor of a given structure. Typically subfloors are made up of concrete or wood products such as plywood, OSB board, etc.
Floating an engineered wood flooring is done using an underlay between the sub floor and the new floor and then the engineered flooring is laid over the top and glued at the tongue and grooves to keep it together. if the flooring is a click joint then gluing is not required.
Grano Screed is a type of flooring. The flooring is a tile-type of flooring. You need to use cement to put the flooring down.
The difference between natural flooring and engineered flooring is that natural flooring is not altered, in the manner that engineeered wood is altered.
Laminate flooring is not real wood, it just imitates the look of it.
Engineered flooring is a type of flooring that comes under the wood flooring category. You can get engineered flooring done at your home as it is non susceptible to water and can withstand any pressure. It keeps a normal temperature irrespective of any weather conditions. Cleaning is also not an issue. Thus, engineered flooring is a great option if you have been planning to get flooring done for your house or office.
Water damage can do it.Termites can too.
If you are building a new home, by the time you get to flooring it will be dry.
Yes, they sit on top of the flooring. You may be able to pull them out from under the base, but that will be hard if they are nailed down close to the wall.
Absolutely.
Floating an engineered wood flooring is done using an underlay between the sub floor and the new floor and then the engineered flooring is laid over the top and glued at the tongue and grooves to keep it together. if the flooring is a click joint then gluing is not required.
Generally speaking, the thickness of the plywood layed directly over floor joist.
It will dry just fine... after you remove the flooring...
The thickness is mainly for refinishing. Thicker wood can be refinished more times than thinner. If you are laying on a cement slab, you want to use a vapor barrier. Some flooring products have a barrier preinstalled on the undersideof the flooring.
The contractor will get a bid from the sub contractor and add his percentage, then present the change order to the customer. This depends on the change. Some changes are items which are pre-set arrangements between the contractor and sub that can be priced without a bid from the sub. Flooring for example.
the tile installer
Sweep it into heaps, shovel it into garbage bags. Now repeat with a much finer broom .
The type of underlay you need will depend on the type of sub floor or floor you are putting the laminate on is made of. If the sub floor is made of concrete, you would want vapor barrier underlay. If the sub floor is made of wood a standard or premium underlay would used.