sometimes when we are drilling we need to use drilling fluid which are mixture of two phase like oil and gas or water and oil. In such case the fluid which is running outside is known as continuous phase of drilling fluid.
Water based drilling fluid that contains dispersed oil or synthetic hydrocarbon as an internal phase.
There is no advantage with foam in drilling fluid. When drilling fluid is foaming, it's not cooling or lubricating.
Yes, it is. Drilling fluids, the circulating fluid for drilling operations, is a mixture of the fluid, the solid and chemical agents. It is usually known as the "mud" or the "blood of drilling" deriving from its distinctive significance.
lubricant
Fluid clutches are used on equipment that is subjected to continuous running.
It's used to prevent anything coming back up the hole. Drilling fluids, the circulating fluid for drilling operations, is a mixture of the fluid, the solid and chemical agents. It is usually known as the "mud" or the "blood of drilling" deriving from its distinctive significance. The main functions of drilling fluids include providing hydrostatic pressure to prevent formation fluids from entering into the well bore, keeping the drill bit cool and clean during drilling, carrying out drill cuttings, and suspending the drill cuttings while drilling is paused and when the drilling assembly is brought in and out of the hole. The drilling fluid used for a particular job is selected to avoid formation damage and to limit corrosion.
Instituting continuous improvement strategy is a common BPR phase that includes ongoing improvement and measurement of new processes and systems.
i think fluid phase it is being produced by gases and liquid
THE DRILLING MUD FLUID IS HAVE MANY FUNCTION IN OIL WELL DRILLING LIKE (a) to lift the cutting, (b) to give cooling effect of bit (c) control the wellbore pressure (d) act as a lubricater (e) hole stabilizer etc. The main functions of drilling fluids include providing hydrostatic pressure to prevent formation fluids from entering into the well bore, keeping the drill bit cool and clean during drilling, carrying out drill cuttings, and suspending the drill cuttings while drilling is paused and when the drilling assembly is brought in and out of the hole. The drilling fluid used for a particular job is selected to avoid formation damage and to limit corrosion.
The Implementation Phase requires continuous reassessment because management wants to work out all of the kinks. They check systems and processes during this phase.
Both are same
It goes up