"Square peg in a round hole" means something that doesn't fit in where it is; the opposite is something that is exactly where it should be. An example of this might be "hand in a glove".
the things on both sids of each tire on a trick bike or bmx bike are called pegs
There is a new book called 'Solving Stonehenge' that explains how the prehistoric surveyors went about setting it out with ropes and pegs. If you follow the geometric method they used (using a compass and a straight edge) you will get an absolutely perfect match for the positions of the stones. To show how it was done two guys laid it out on the ground (every stone position, and at full size) in two hours.
Firstly measure and take the dimensions of the area where you want to pour in the concrete slab. Now, make a lumber frame. This frame will act like a border and will now allow the concrete to spread out from the area. Nail a piece of lumber from one corner to the other on top of the frame so as to ensure the frame remains square till pegged in place. Now see that the frame is level and fastened with pointed pegs at 3 feet intervals against the exterior of the form work. Next, make a 4 inch deep ditch around the border of the floor area with a width of 8 inch. Use a shovel to do so. This is mainly for giving the border strength and depth. Now saw the top of the pegs and make them even with the top of the frame. Sprinkle little water around the area and mix the concrete. Pour and fill the area with concrete to a height of approximately 3 inch below the top of the frame. Add steel rods as reinforcement to handle cracking and give support to the slab. Now you have to lay a rod of thick reinforcing steel around the boundary of poured cement, the rod should be atleast 2 inch in and about 2 inch down from the top of the frame. Also make a 16 inch overlap and try to secure it with wire in places where the steel rods join. Pour another batch of concrete mix into the frame to the height of the top of the frame and you need to eliminate all air pockets. Use a hammer to tap around the exterior of the frame and to level out the exterior, you can use a smooth and straight piece of lumber, moving it in a sawing motion along the tops of the frame till the concrete is smoothed throughout. Now you should smooth over the levelled concrete. You can use a trovel for it by sweeping it to and fro in broad arcs. You can allow it to dry. You can also re-trovel the area if you wish. If the frame is easy to detach, you can remove it after 24 hours. Hope this helps.
The duration of Square Pegs is 1440.0 seconds.
Square Pegs ended on 1983-03-27.
Square Pegs was created on 1982-09-27.
Square Pegs - 1982 was released on: USA: 27 September 1982
Square Pegs - 1982 is rated/received certificates of: USA:TV-G
Square Pegs - 1982 Square Pigskins 1-4 was released on: USA: 18 October 1982
The duration of Square Pegs - Hong Kong TV series - is 2700.0 seconds.
Square Pegs - Hong Kong TV series - ended on 2003-01-24.
Square Pegs - Hong Kong TV series - was created on 2002-12-30.
splitters
Wallflowers - 2013 Square Pegs 1-1 was released on: USA: 3 April 2013
Square Pegs - 1982 A Cafeteria Line - 1.2 was released on: USA: 4 October 1982