Optimum Utilization of Machine means to use a Machine in such a way that we produce at the maximum capacity after spending its minimum maintenance and other variable cost.
In Short, Higher Productivity in low Cost.
Horizontal and vertical milling machine.
There is no difference between a turning machine and a lathe. They are two names for the same kind of machine
A drip-proof machine is one where the design of the various vents does not allow water and other contaminants that fall on the machine to enter the machine.
operation in shaper machine
centering machine purposes
Perform a Needs Assessment and then measure outcomes to see if they match.
According to the American Institute of Industrial Engineers, Industrial Engineering is concerned with the design, improvement and installation of an integrated system of men, machine and equipment. Objectives : to improve productivity optimum utilization of resources Father of Industrial Engg : Frederick Taylor a piece of mother natire
normal working time divided by total working time.
Over utilization means that the processing plant cannot cope with it workload and is over worked as p >1. The system will be unstable as the utilization factor [p] should be less than 1 strickly between 0.75 and 0.9 for the machine to be stable. If a machine is over utilized , the maintenance cost will be greater and the wear and tear will be exponentially increased thus more down time causing a slow in production
Over utilization means that the processing plant cannot cope with it workload and is over worked as p >1. The system will be unstable as the utilization factor [p] should be less than 1 strickly between 0.75 and 0.9 for the machine to be stable. If a machine is over utilized , the maintenance cost will be greater and the wear and tear will be exponentially increased thus more down time causing a slow in production
It refers to the extent that you are using a machine efficiently and it can be found by the formula as follows U=(t*AP)/h where U=machine utilization t=machining time for one component AP=actual production per shift h=number of hours per shift note: keep both t and h in same units,say seconds.
utilization of teaching aids?
Machine Efficiency= Work done by a machine on a load divided by work done on a machine by an effort force. multiply that by 100%. Work(J)=force(N)multiplied by Distance(m). ---- The answer above is correct but not much use for a practical situation such as a motor driving a pump or a compressor being driven by a turbine. The number of calculations in this subject is vast. A good place to start your search is at VibroNurse (www.vibronurse.com) where there is a sizable section of free materials which you can use to calculate efficiencies for various types of machinery.
resources which are not fully tapped are known as potential resources.they need detailed survey for there use. actual resources are fully taped and their quantities are confirmed .there optimum utilization depends upon the development of the technology
How do I compute Asset Utilization ratio
How do I compute Asset Utilization ratio
How do I compute Asset Utilization ratio