Crushed concrete is sold by the ton. One dumptruck will haul between 13 and 15 tons. Your driveway should take around 30 tons if covered 4" thick.
To calculate the amount of crushed concrete needed for a 300' x 12' driveway, first find the area in square feet: 300 x 12 = 3,600 square feet. If you plan to have a depth of 4 inches (which is standard), convert that depth to feet (4 inches = 1/3 foot). Multiply the area by the depth: 3,600 x (1/3) = 1,200 cubic feet. Since there are 27 cubic feet in a cubic yard, divide by 27: 1,200 ÷ 27 ≈ 44.44 cubic yards. Therefore, you would need approximately 45 cubic yards of crushed concrete.
The term "yards" of concrete means cubic yards.
You would need about 5 cubic yards. Gravel is usually sold by the ton. I do not know that conversion. Who ever would deliver it for you should be able to help. If I were using crushed concrete I would use 15 tons... but I can not spread it 1" thick either.
Not square yards, but Approx. 5.24 cubic yards 54'2" = 650" x 7'10" = 94" x 4" = 4" = 244,400 cubic inches / 46,656 cubic inches = 1 cubic yard (36" x 36" x 36")= 5.24 cubic yards
25 Yards of concrete
The formula I use is 15 tons = about 12 yards.
To calculate the amount of crushed concrete needed for a 300' x 12' driveway, first find the area in square feet: 300 x 12 = 3,600 square feet. If you plan to have a depth of 4 inches (which is standard), convert that depth to feet (4 inches = 1/3 foot). Multiply the area by the depth: 3,600 x (1/3) = 1,200 cubic feet. Since there are 27 cubic feet in a cubic yard, divide by 27: 1,200 ÷ 27 ≈ 44.44 cubic yards. Therefore, you would need approximately 45 cubic yards of crushed concrete.
4"x16'x32' = 2.370370... cubic yards
20 times 50 divided by three is 333 1/3
16 ft * 47 ft * 4 inches =16/3 yards * 47/3 yards * 4/36 yards = 9.3 yards approx.
About 3 1/2 ". 432 x .375 = 162cf / 27 = 6 cu yards
3feet = 1yard12ft=4yrd24ft=8yrd 4x8=32square yards. don't know how ye do it in the states but in Ireland we using metres. I'm guessing though that you need to ask for the volume of concrete in which case you're asking for 5.5 cubic yards. i.e. 32sq yrds x 0.1666yrds
The term "yards" of concrete means cubic yards.
It is: 22*5 = 110 square yards
You would need about 5 cubic yards. Gravel is usually sold by the ton. I do not know that conversion. Who ever would deliver it for you should be able to help. If I were using crushed concrete I would use 15 tons... but I can not spread it 1" thick either.
A fence A rope A driveway
Assuming a packing fraction of 74%, it would be 1/0.74 = 1.35 cubic yards.