Barring purchases that reach to the extreme, ie: a wolf range in the kitchen or fixture choices that can run as high as you are willing to pay... labour and materials on a project of any reasonable size, are about equal. Smaller, specific jobs can run more to one side or the other, but this is a general rule that works in most cases. 50/50

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

In construction which is the proper term for the cost of construction material is it price or cost?

Cost is the correct term to use, whether it be direct costs such as materials and labor or indirect costs such as overhead or supervision.


What percentage should labor cost on a construction project?

Labor costs should be no more than 20 to 30 percent on a construction project. The cost may be lower for residential projects and higher for commercial projects.


What are material costs for road construction?

For instance, where material costs account for 42.9 percent of residential construction, they consume only 32.6 percent of highway and street construction. Overall, 37 cents of every construction dollar is spent on materials, 40 cents on labor


What does BoQ mean?

In the business world, BoQ means "bill of quantities." A bill of quantities is a document used in tendering in the construction industry in which materials, parts, labor, and labor costs are itemized.


Who are good construction management trainers?

A good construction estimator is one who accurately forecast the cost of future projects and compiles and analyzes data of all the factors that can influence construction costs. These cost include construction materials, construction labor, construction location, and special machinery requirements.


What two elements may be thought of as a pool of costs?

Labor and materials may be thought of as a pool of costs. Labor costs represent the expenses associated with the workforce, while materials costs refer to the expenses related to the raw materials or components needed for production.


How can reusable concrete forms help in reducing construction costs and environmental impact?

Reusable concrete forms can help reduce construction costs and environmental impact by eliminating the need for disposable forms, reducing waste, and decreasing the amount of materials needed for each project. This can lead to cost savings on materials and labor, as well as a reduction in overall construction waste and environmental footprint.


What should the relationship of material cost to labor cost be?

multiply the cost of labor by the cost of materials. add the cost of labor and materials. subtract the cost of labor from materials. divide the cost of labor by the cost of materials. which one is correct


What are the advantages of using lightweight framing material in construction projects?

Using lightweight framing materials in construction projects offers several advantages. These materials are easier to handle and transport, reducing labor costs and construction time. They also allow for greater design flexibility and can be more sustainable, as they often require less energy to produce. Additionally, lightweight materials can improve the overall energy efficiency of a building and reduce the load on the foundation and structure, potentially lowering construction costs.


Briefly explain the 3 basic elements of costs?

The three basic elements of costs are direct materials, direct labor, and overhead. Direct materials refer to the supplies used in production, direct labor refers to the cost of labor directly involved in production, and overhead encompasses all other production costs not directly tied to materials or labor.


What are construction costs?

Construction cost is expense incurred by a contractor for labor, material, equipment, financing, services, utilities, etc., plus overhead and contractor's profit. Costs such as that of land, architectural design, consultant and engineer's fee are not construction costs.


What costs other than direct materials costs and direct labor costs incurred in the manufacturing process are classified as?

Indirect costs(salaries, materials not directly involved in manufacturing), period costs(selling and admin costs)