answersLogoWhite

0

AllQ&AStudy Guides
Best answer

0.5mm

This answer is:
Related answers

0.5mm

View page

0.025

View page

You have two options, one is a complete service change. The average house service these days is 200 amps 42 circuits. The second option is to install a sub panel off the existing service. Depending on how many circuits you need will govern the size the sub panel. Here is where it gets tricky. Two side by side single pole breakers or one two pole breaker will have to be removed from the original service panel and replaced with a new two pole breaker. The size of this breaker will be governed by the total load of the new sub panel. The wire from the new sub panel to the two pole breaker is also governed by the load of the sub panel. As an electrician I would recommend that you not do it yourself but get a qualified electrician to do it for you. He would (should) take a permit out for the job and get it inspected.

View page

the stone breaker

View page

The breaker will have a black wire connected to it. Turn off the main breaker and then disconnect that black wire from the breaker. The breaker will snap into the main bar. Remove the breaker and install the new one. Reconnect the black wire to the breaker and then install the cover and turn the main breaker back on.

View page
Featured study guide

Astronomy

11 cards

What can be either a precursor to a star or the remains of a star

What is the most expansive layer of the Earth

Which type of basic scientist is most likely to be employed in industry

Which type of scientist studies natural hazards such as volcanoes and earthquakes

➡️
See all cards
No Reviews
More study guides
No Reviews

No Reviews
Search results