3x3x3=27 last time I checked
27
3
9
When it comes to mulch or concrete, a so-called "yard"actually means a "cubic yard".1 cubic yard = 27 cubic feet2 cubic yards = 54 cubic feet...6 cubic yards = 162 cubic feet ( = 81 bags )
1 cubic yard = 27 cubic feet 4 cubic yards = 108 cubic feet Since each bag contains 2 cubic feet of mulch, the required number of bags is 108/2 which is 54
201.6 cubic ft
33.33 cu yds
One cubic yard of mulch will cover approximately 160 square feet at 2" deep, so you would need approximately two cubic yards of mulch to cover 271 square feet at 2" deep.
17,116 cubic feet is equal to about 484.7 cubic meters.
54 cubic feet is equal to 2.07 cubic yards.
0.73524306 Cubic Feet
1.80468751 cubic feet ==
1 cubic yard = 27 cubic feet, thus 1 cubic feet = 1/27 cubic yards and 2 cubic feet = 2/27 cubic yards (1 bag of mulch) Landscapers speak in yards of mulch needed for a garden. They are referring to cubic yards. A bag of mulch is 2 cubic feet, so you would need 13.5 bags of mulch to equal 1 cubic yard (yard of mulch)
6,566.4 cubic inches = 3.8 cubic feet
1,172 cubic inches is about 0.68 cubic feet.