A metre is a unit of length. A cubic yard is a unit of volume. The two units are therefore incompatible.
39 cubic yards is 29.81 cubic meters.
The term "yards" of concrete means cubic yards.
30,000 (cubic yards) = 22,936.6457 cubic meters
26.94 cubic yards = ~20.6 cubic meters.
34,438 cubic meters = 45,043.2 cubic yards.
85.8 cubic meters = 112.22 cubic yards
.029 cubic yards of concrete weighs aproximately 93.96lbs
30 cubic yards equates to 22.94 cubic meters.
1.8 cubic yards will do it.
1.67 cubic yards.
0.89 cubic yards.
You will need 0.56 cubic yards of concrete.