Joe needs 460 paving slabs to surrond the pond.
the three dimensions needed to find the area of a rectangular solid object are: Height, Length and Width.
a boxs 162mm long how long is it im metres
Three dimensions are needed to calculate volume. Usually length, width and depth.
It needs: 12*24 = 288 square feet
Area of slab = 0.6 m * 0.6 m = 0.36 sq metres Minimum number of slabs required = 9/0.36 = 25. This minimum number is based on the assumption that the area to be covered is a reasonable shape so that only a few slabs need cutting and that all the resultant offcuts are used - even if part of the area looks like crazy paving!
The answer, not surprisingly, depends on the size of the paving bricks. And since you have not bothered to share that crucial bit of information, I cannot provide a more useful answer.
sddd
Measure the dimensions of the chalkboard, then cut material to those dimensions.
The minimum number of satellite speakers needed for a wireless surround sound system is three. Traditionally there are two to the sides of the seating area, and one directly in front.
It depends what the dimensions of the path are
839
Depends on the size of the flags.
It has the objective of serving its customers. They will provide all the banking services that are needed to assist their customers.
You maintain roads by grading and re-paving them at regular intervals. Holes and damage which occasionally occur are filled in as needed to preserve the remaining surface.
92 should do it.
Like all recent smartphones the HTC Surround will need a data package. The price and the amount of GBs needed is up to what you, personally, will need and what you will use.
length, width, and height