If you're smart, you don't. Roll it back up, stash it in the garage, and go buy a good heavy rubber membrane system. Note that I said "system." Don't try to put things together that aren't made to work together.

If youI think you're stuck with using the rolled roofing, read the manufacturer's installation instructions (not a sales flier) carefully. Check every detail repeatedly until you're sure you understand it. Otherwise, call a professional.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

How to install rolled roofing properly?

To install rolled roofing properly, start by cleaning the roof surface and applying a primer. Next, unroll the roofing material and cut it to size. Secure the roofing with nails or adhesive, making sure to overlap the seams. Finally, add a protective coating for durability.


What is and who performs rolled roofing jobs?

Rolled roofing is another name for a tar roof. Qualified roofing contractors are trained to do this job due to the dangers involved in working in high places and working with hot tar.


How do you add roll roofing under shingle roofing?

I am not sure if this question is worded correctly. 1) To add rolled roofing under shingles is not a recommended method of installation. What will work is to install a layer of Ice & Water Protection such as Grace Ice & Water Shield prior to the installation of your shingles. 2) If you meant to ask about installing rolled roofing over your shingles or installing shingles over your rolled roofing this is once again not recommended but is commonly done. You would first make sure the surface is level and remove all loose debris from existing roofing materials and or dirt, leaves, etc.. Just a quick clean up and sweep should be good. Then if the existing roofing materials are leaking I would recommend you either remove them and do this installation properly or at least install a layer of underlayment such as a heavy 30# felt paper or RoofTop Guard II over the existing materials. Then install the new materials following the manufacturers specifications. Once again this is not the recommended procedure and will void all manufacturers warranties.


What are the key steps to follow for a successful rolled roofing installation?

The key steps for a successful rolled roofing installation are: Prepare the roof surface by cleaning and repairing any damage. Measure and cut the rolled roofing material to fit the roof. Apply adhesive or nails to secure the roofing material in place. Roll out the roofing material evenly to prevent wrinkles or bubbles. Seal the edges and seams with roofing cement to prevent leaks. Allow the installation to cure and inspect for any additional touch-ups.


What is the minimum pitch of a single pitch roof?

1x12 for metal or rolled roofing, 3x12 for shingles.


A roll of rolled roofing covers how many square feet of roof?

Darling, a roll of rolled roofing typically covers about 100 square feet of roof. But honey, don't forget to account for overlaps and waste, unless you want your roof to look like a hot mess. So, measure twice, buy once, and keep that roof looking fierce!


How to install roll roofing properly?

To install roll roofing properly, start by cleaning the roof surface and applying a primer. Next, unroll the roofing material and cut it to size. Secure the material in place using roofing nails or adhesive, making sure to overlap the seams. Finally, apply a top coat or sealant for added protection.


Standing Seam Specialist?

Roofing Depot also provides professional advice and guidance on every aspect of standing seam roofing. For clients who are looking to install a standing seam roofing system for the first time


What are the names of some of the companies in Ottawa that install roofs on commercial buildings?

You'll find over a dozen roofing companies in Ottawa. Some of them include A1 Professional Roofing, Capital City Roofing, G.M. Towns Roofing Services, Rooftek Canada, and Roofmaster Ottawa.


How can I install corrugated plastic roofing on my shed?

To install corrugated plastic roofing on your shed, start by measuring the roof and cutting the panels to size. Secure the panels to the shed using roofing screws and washers, making sure to overlap them properly. Seal the edges and seams with roofing tape or sealant to prevent leaks. Finally, add ridge caps to finish the installation and ensure proper drainage.


How do I install roofing drip edge properly?

To install roofing drip edge properly, first, ensure the roof deck is clean and dry. Place the drip edge along the eaves, overlapping the edge by 1/4 inch. Nail it in place every 8-10 inches. At the corners, cut and overlap the drip edge. Finally, install the roofing material over the drip edge.


What kind of roofs do modular homes have?

Usually fairly low peaked roofs with interior joists similar to regular houses. They have all kinds of covering. Ones near me have duroid shingles, wood shingles, rolled roofing and metal roofing.