A typical mixture of concrete will be 10 to 15% cement, 60 to 75% aggregate, and 15 to 20% water.
7 cement bags per 1 cubic meter of concrete......
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
One ton
You calculate the total cost of 1 cubic meter reinforcement cement for heavy foundation work by adding all of the costs. Essentially you would have to figure out the total of pounds of concrete for 1 cubic meter multiply that by the cost per pound and then add in the cost of labor it takes to pour 1 cubic meter.
0.2
7 cement bags per 1 cubic meter of concrete......
One cubic meter is equivalent to 35.23 cubic feet, or one cubic meter is equivalent to 1.35 cubic yards.
1%
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete
I'm assuming by bricki you mean aggregate? There are several different mixes of concrete that yield different strengths. One of the more common mixes is a 3/2/1 mix this combines 3 parts aggregate (crushed stone), 2 parts sand and 1 part portland cement. with this mixture to make 1 cubic meter of concrete you will need almost 1/2 cubic meter of aggregate, 1/3 cubic meter sand and 1/6 cubic meter portland cement mixed with about 75 liters of water. Different mixes use varying amounts of stone though the sand and cement mixture stays between 1 1/2 : 1 to 2:1
2900
300kg
One ton
varies due to moisture content of aggregate and stiffnes of mix needed (slump)
An 80 pound bag of premix concrete will make .6 cubic feet of cured concrete. There are 27 cubic feet in a cubic meter, so it would take 45 80 pound bags to make one cubic meter.
How much cement sand and stone do you need for 1 cubic meter of concre