It takes up to 5 years.
It takes 20000 day to build an oil rig.
Normally a Tanker carries some liquid, mostly Oil, therefore the term "Oil Tanker".
It was not an oil tanker, but a drilling platform.
The worlds first successful oil tanker was built by Ludvig Nobel
Filling up an oil tanker can take anywhere from several hours to a few days, depending on the size of the tanker and the flow rate of the loading facility. Larger tankers, such as supertankers, may require between 24 to 48 hours to fully load. The loading process involves careful coordination to ensure safety and efficiency, as well as compliance with environmental regulations.
The Mega Borg tanker spilled oil into the Gulf of Mexico in 1990.
Approximately how far off course was this oil tanker?
Transporting Oil.
about a fiver
A Oil Tanker can carry up to 550,000 DWT '' Dead Weight Tons'' DelSol_Racer.
The world's largest oil tanker is the Hua San built in 2008 and waving the Singapore flag. It measures 333 meters long and 60 meters wide with a gross tonnage of 164,680 tons.
The weight of an oil tanker can vary depending on its size and capacity. On average, an oil tanker can weigh anywhere from 50,000 to 500,000 tons when fully loaded with oil.