answersLogoWhite

0

What else can I help you with?

Related Questions

What were the roles of Ancient Egyptian women?

The roles of the ancient Egyptian women were mainly to do the household chores and also to take care of the family.


How long did the Egyptian mummification take?

Seventy days.


How long did it take to build a Egyptian house?

7000000000000 CENTURIES


If sue can shovel her driveway in 80 minutes and when her husband helps both of them together can shovel it in 50 minutes how long would it take her husband to shovel the driveway alone?

If when her husband helps it doesn't cut the time in half. Then her husband is a wimp.


How long does it take to make an Egyptian head dress?

20 mins


If Sue can shovel snow from her driveway in 30 minutes Tom can do the same job in 50 minutes how long would it take sue and tom to shovel the drive way if they worked together?

not enough information


What rights did ancient Egyptian woman have?

they could make the food and take care of there crippled children. -true fact by the way


What does slim tell carlson to take with him when goes to shoot candys dog?

Slim asks Carlson to take a shovel with him when he goes to shoot Candy's dog because he was being careful and understanding towards Candy's dog's death. He reminds Carlson to take a shovel to hint to Candy that 'It's alright, He's going to get a proper burial' and was intended to make Candy feel better.


Jane can shovel the snow from the sidewalk in 45 minutes if jane and joe work together it takes them 25 minutes to shovel the sidewalk how long will it take joe to do the job if he works alone?

45-25=20 minutes


Brandon can shovel the driveway in 8 min while his brother can shovel the driveway in 12 min How long will it take them to shovel the driveway together?

About 5 minutes for the two of them together. One brother can do half in 4 minutes, the other in 6 minutes. The average of the two numbers is 5 minutes.


Janet can shovel snow from her driveway in 45 minutes Bill can do the same job in 65 minutes How long would it take Janet and Bill to shovel the driveway if they worked together?

About 26 mins 35 secs (26.6 mins). In 1 minute, Janet will shovel 1/45 of the snow and Bill will shovel 1/65. Thus in 1 minute, working together they will shovel 1/45 + 1/65 = 22/585 of the snow. Thus to shovel all the snow will take: 585/22 minutes = 2613/22 minutes ~= 26 mins 35 secs.


How long does it take to dig a grave with a shovel?

Obviously, it depends on the size of the hole, but a tipical grave takes about 2-3 hours to dig, using just one shovel.