2 months is 8 to 9 weeks. It could be from 59 to 62 days, with an average of 61 days (8 weeks 5 days)
10 weeks is longer and 2 months is shorter
224 days = 32 weeks = 7 months 2 weeks.
A little less than 2 months.
2 1/2
i am guessing that it should be 2 months and 2 days or a bit less or more
2 months and 8 weeks
3 months and 2 weeks.
12 1/2 months are in 54 weeks
2 1/2 months
Almost 3 months....about 2 months and 3 weeks.
Well, it depends on how long the months are, but if each month had 4 days, there would be 40 weeks in 10 months.
2 and 1/4 months
its about 8 1/2 months
not necessarily... if you do the math, 8 weeks is only 56 days and 2 months usually has 61 days, so it doesn't follow that 8 weeks is the same as 2 months...
Two months and two weeks.
37 weeks is about eight and a half months.
8 months and 2 weeks