You will need 3.1 cubic yards or 139 80lb bags. This assumes a waste of about 5% which is typical.
its about 12x5x67 respectively
It depends on the depth required
2.15
At least 28.5 cubic yards for a 6-inch depth.
22 cubic yards
The depth of the pour would also be necessary to calculate the volume of concrete needed.
its about 12x5x67 respectively
To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.
96 cubic feet of concrete
a lot.
0.246914 cu. yards (6.666667 cu. ft ) of concrete is needed.
First find out how much concrete is needed for your project thwn do the calculations.
Concrete contractors give individual quotes for each job. Prices would be worked out according to size of the area, materials needed and the amount of labor hours.
The amount of concrete needed for a fence post depends on the size and depth of the hole. Typically, a 50 lb bag of concrete mix is enough for one standard fence post.
Approximately 12.35 Cubic Yards.
To calculate the amount of concrete needed for a 4x4 post, you can use the formula: volume length x width x height. For a 4x4 post, assuming a height of 8 feet, the volume would be 4 x 4 x 8 128 cubic feet. This would require approximately 1.5 cubic yards of concrete.
The amount of concrete needed per fence post depends on the size and depth of the hole, but typically around 1/2 to 1 cubic foot of concrete is used per post.