Want this question answered?
60 bricks to 1 square metre for a wall 1 brick thick. 120 bricks to 1 square meter for a 2 brick thick wall. 10 standard concrete blocks to 1 square metre. 6 bricks equal 1 block. 1kg of mixed mortar per brick laid and 2.25 kg per block laid. On average use 5 wall ties in cavity wall construction per metre square
One cubic meter of rough (paddy) rice weighs about 577 kilograms or 1,273 pounds.
A cubic meter is larger.
27 cubic meters
1 cubic meter is a unit of volume while square meter is a unit of area. We can not convert volume into area.
one cubic meter is equivalent to 1000 cubic decimeters or 1000 liters. assuming the amount of mortar used has a volume of 2/3 of 1 brick (figuring on standard red brick of 2.5 x 5 x 10 inch bricks) per brick, then the amount of mortar used will be about 333 1/3 liters. if 1/3 of the volume of the mortar is water then the dry ingredients are equal to 222.222 liters. of that: 1/6 of the dry ingredients are portland cement if you are using a 3:2:1 (sand, lime, cement) or 37.04 liters.
0.3 cubic meter cement mortar consumes.
7 bags cement
That depend on the size of each brick of course. 500 standard masonry brick that are 230 * 110 * 76 millimeters have a volume of almost exactly 1m3 This is without any mortar
1 cm cubed or 1cm3
32
1:6 brick work sand consumption for 1 cubic meter = 9.71 cft 1 cubic meter brick work cement consumption = 1.32 bags 1.32/28.8= .0458 cubic meter .458*6 = .275 .275*35.31 =9.71 cft
It depends on the size of the bricks.
28.60kn
what is the weight of concrete block work per cubic meter.
500 bricks
are these concrete blocks and allowing for mortar. 12.5 per square metre, 62.5 per cubic metre with mortar