-- 38,899 gallons
-- 192.6 cubic yards
5200 cubic feet
They do not directly convert. Cubic feet is a measure of volume while square feet is a measure of area.
You would need 48 cubic feet of corn.
Sand needed: 8*6*1.5 = 72 cubic feet
1 sq ft = 1/9 sq yard so 5200 sq ft = 5200/9 = 577.77... sq yards 1 inch = 1/36 in so 4 in = 1/9 yards So 5200 sq ft * 4 in = 577.77... *(1/9) = 64.198 cubic yards (to 3 dp).
3 inches = .25 feet400 square feet X .25 feet = 100 cubic feet100 cubic feet / 27 cubic feet per cubic yard = 3.7 yards
217147
To determine the amount of sand needed to cover 115 sq feet 1 inch thick, you need to calculate the volume in cubic feet. Since 1 cubic foot is equal to 12x12x1 = 144 cubic inches, the volume of sand required is 115 sq feet * 1 inch / 144 = 0.7986 cubic feet.
27 cubic feet = 1 cubic yardVolume = (26-ft x 23-ft x 1/2-ft) = 299 cubic feet = 112/27 cubic yards
18 cubic yards or 487.5 cubic feet.
No because it is 5280 feet
More info needed. How much does 0.4 cubic feet of what weigh? Air? Lead? Water? Dirt?