4 quarts approx.
An 80-pound bag of premixed cement = .667 cubic feet, or 2/3 of a cubic foot, of concrete. A 60-pound bag of premixed cement = .5 cubic feet, or 1/2 of a cubic foot, of concrete.
1.8 Cubic yards of concrete is 48.6 cubic feet. Each 80lb bag of concrete is .6 cubic feet. Therefore, you would need 81 bags. Hope that helps. GEO
0.6 cubic feet in one 80 lb bag. with there being 27 cubic feet in one cubic yard: 0.02 cubic yards per bag, in other words, it would take 45 - 80lb bags to yeild 1 cubic yard of concrete
3 qts
Most bags will make a 1/3 of a cubic foot of concrete.
Every 80lb concrete bag should be mixed with 4 quarts or 3.7 liters of water. This mixture will allow you to place aproximately .60cu/ft of concrete. There are 27 cu/ft in a cu/yd. The number then becomes .0222 yards per 80lb bag. Therefore 45 bags of 80lb (4000 psi) concrete ready mix will be enough for 1 yard of concrete.
An 80lb bag of concrete you can at your local home improvement store covers about 4 square foot at 2" thick. So you would need about 144 bags of 80lb concrete.
An 80-pound bag of premixed cement = .667 cubic feet, or 2/3 of a cubic foot, of concrete. A 60-pound bag of premixed cement = .5 cubic feet, or 1/2 of a cubic foot, of concrete.
the price of one bag of cement in India is about 200 rupees.
1.8 Cubic yards of concrete is 48.6 cubic feet. Each 80lb bag of concrete is .6 cubic feet. Therefore, you would need 81 bags. Hope that helps. GEO
3.50
This all depends on the mix you want. I assume you mean cement when you mention the 80lb bag of concrete. I have pushed concrete in my day... Bag cement mix is the same as concrete. Don't be funny. How many 80 pound bags will make 1 yard of concrete? I want a definitive answer this time.
0.6 cubic feet in one 80 lb bag. with there being 27 cubic feet in one cubic yard: 0.02 cubic yards per bag, in other words, it would take 45 - 80lb bags to yeild 1 cubic yard of concrete
3 qts
Price ranges from $3-$6 in the midwestern U.S. as of January 2009.
If memory serves me correctly it takes 3 80lb bags to make a cubic ft so one bag is .3333 cubic ft.
Most bags will make a 1/3 of a cubic foot of concrete.