First the site was surveyed and levelled to provide a foundation for the Pyramid.

As the slaves cut the first stones for the pyramid from nearby quarries, thousands more began building the causeway, erecting storehouses and digging a canal to link the foot of the plateau to the Nile. Meanwhile scribes, the Pharaoh's project managers, dispatched orders for more supplies and labour both skilled and unskilled.

At any one time as many as 20,000 workers may have been involved on this massive project. Some of them were free men doing particular tasks such as masons, tool makers, carpenters, scribes and overseers. Many of course were unskilled slave labourers. A town was built for the free workers where they were provided with houses, food, clothing and even medical care. Less comfortable accommodation in the form of barracks was provided for the slaves.

Through the Pharaoh's reign, the construction site teemed with workers of all kinds hard pressed to complete the monument before the king's death. Khufu and his architects did not make it easy for them. The royal planners decided to enlarge the structure several times and relocate the burial chamber from beneath the structure to its inner reaches. The quarries are places of great activity creating clouds of dust. Through this dust the naked bodies of quarry slaves stand out dark against the yellow stone. Slaves are boring holes using primitive drill bits and sand which acted as an abrasive. After they had drilled cores deep enough to define a block on one side, they packed the holes with pieces of porous wood and then pour water into the holes. The wood expands so fast that the block splits out with a bang (or at least a crack). After the stone blocks are extracted from the quarry face they are lowered onto sledges. A mark is made on the stone by a scribe. This aided them to place the blocks in the pyramid just as they came out of the quarry ensuring a good fit without further finishing.

From dawn to dusk, gangs of naked slaves drag the sledges loaded with stones each weighing about 2.5 tons to a staging area at the base of the pyramid. Most of the stone blocks proceed up the ramp without future handling. Only a fraction of the stone blocks needed to be cut to precise dimensions by the masons. The slaves begin hauling the loaded sledges slowly up the clay and rubble ramp that spiralled around the emerging structure. The noise here was one of chanting slaves, the rumble of heavy sledges and the swish of the overseer's lash.

Boats made from reeds deliver brilliant white limestone from Tura just across the river. This stone will be used for the outer case of the pyramid. Once put in place and polished the effect will be awe inspiring. Giant barges brought granite from Aswan over 400 miles upriver. Some of the granite stones from Aswan weigh to 70 tons.

At the working level teams of slaves called setters shifted the blocks from the sledges into their designated positions. Once the stones had been delivered the hauling gang would make their way down the ramp carrying their sledge, in order to make the same back breaking journey up as they would several times a day. Toiling below were the support workers: tool makers, cooks, porters and guards under the watchful eyes of the scribes, the royal project managers.

Other slaves are employed in maintaining and extending the ramps as the pyramid grew. These ramps are made of rubble, bound together with desert tafla (a type of clay) and laid with planks to ease the passage of the ramps. Rows of slave labourers are seen breaking up waste material from the quarries, mixing them with the desert tafla clay and loading the finished mixture into baskets. Individual baskets are loaded onto the shoulders of slaves for delivery to the ramp builders on the pyramid.

User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: The genre of How Were The Pyramid Built?
Write your answer...
Submit
Still have questions?
magnify glass
imp