Work is energy. Any unit of energy can be used to describe a quantity of work.

Units of energy always boil down to (a length unit) times (a distance unit), though

these may be disguised. Some popular units of work/energy are . . .

-- newton-meter

-- foot-pound

-- dyne-centimeter

-- inch-pound

-- watt-second

-- joule

-- horsepower-hour

-- calorie

-- kilowatt-hour

The [ton-furlong], though dimensionally correct, is seldom used.

User Avatar

Wiki User

12y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

12y ago

The SI unit measurement for work is the Joule (J). One Joule is equal to 1 (kg.m2)/s2, or 1 N.m (1 Netwon-meter).

This answer is:
User Avatar

User Avatar

Wiki User

11y ago

Same as units for energy. The international unit is the joule.

This answer is:
User Avatar

User Avatar

Wiki User

15y ago

joules (J) or Nm

This answer is:
User Avatar

User Avatar

Wiki User

15y ago

The Joule, J.

This answer is:
User Avatar

User Avatar

Wiki User

14y ago

joules

This answer is:
User Avatar

User Avatar

Anonymous

Lvl 1
3y ago

joule

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Units for work
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What are the dimensions of a rectangle that has a perimeter of 44 units and an area of 105 square units?

The dimensions work out as 7 units and 15 units


Are the units for work and energy equivalent?

Yes, work and energy have the same units. In the SI system, both are measured in Joules.


What unit would you use to measure width of a football pitch?

Yards if you work in imperial units or metres if you work in metric units


What is exact difference between integration and system testing?

After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.After units have been tested, the system must be put together. This involves units starting to work with other units. This is integration. We then need to test how the individual units work with each other, which is integration testing. Just because individual units work properly, that does not mean they will still do so when we connect them with other units. That is why we need integration testing. When all the system has been integrated, we now have a full system. All the individual integrations will have worked, but again that does not mean the whole system will work. At this point we need to do system testing. So in short integration testing is checking how individual units work with other units the communicate with and system testing is testing an entire system.


What are units of measuring work?

Work is measured in joules per second


What are units for work and heat?

a7a neeiik


Work is measured in the same units as what?

energy


Does Work And energy Have The Same Units?

Yes.


What is the physical quantity which has the units Nm?

A joule has units of N-m. It is a unit of energy or work.


What is the label for work?

Work is measured in joules or in watt-seconds, or equivalent units.


What is the formula and unit of work in science?

work=f*d units: Nm


What standard units are used for work and force?

Force: Newton Work: Joule