answersLogoWhite

0

Your criteria is(goals) and constraints are(limits).

User Avatar

Zi Xin Chen

Lvl 5
4y ago

What else can I help you with?

Related Questions

What is the difference between constraints and criteria?

A constraint has a limit as for criteria: to end a loop Excel Questions


What is it meant by constraints and criteria?

a constraint is a need and criteria is a want


What are constraints and criterias?

A constraint "CONSTRAINS" what can be inserted in a field, or what is provided in a result set. As an example you can add a constraint to a field that says whatever data is inserted MUST be 10 characters in length. constraints format the existing system in an elucidating manner by enhancing or modifying the existing rules


Why are criteria and constraints important to a design?

it is the limits and necessity of the designs that allow it to function correctly and provid ethe consumer with a pleased design


What are constraints?

A constraint is something which constrains, which inhibits freedom in some way. Constraints can be physical, like a straitjacket, or legal, such as laws and regulations which restrict behaviour, or social, such as rules and customs of conduct.


Why is it important to evaluate possible solutions during the engineering design process?

Brainstorming produces many ideas that will not work


Which step in design process uses in a design brief?

Identify Criteria and Specify ConstraintsIdentify constraints (i.e., budget and time are typical considerations).Draft the Design Brief.


What three ways are constraints classified?

Constraints can be classified as time constraints (scheduling deadlines or project duration), resource constraints (limited budget, personnel, or materials), and scope constraints (limitations on features or requirements).


What are the three ways are constraints classified?

Constraints can be classified as scope, time, and cost constraints. Scope constraints define the project's boundaries and deliverables. Time constraints refer to the project's schedule and deadlines. Cost constraints relate to the project's budget and financial resources.


The constraints on the management of change?

The constraints on the management of change?


What are the common constraints to any project and why are they called constraints?

Common constraints in a project include time, cost, scope, and quality. They are called constraints because they limit the project's flexibility and resources. Effectively managing constraints is critical to the success of a project.


What constraints did you face when making these decisions?

I face the constraints of money.