The programme refers to a masterplan divided up by tasks and durations.
When a schedule is compared to the programme. The schedule referes to isolated / target plans with in the programme.
2
Delhi schedule of rates 2007 of Central Public works department
The average markup for Cost Plus contracts for Design Build vs EPC projects is about $ 1200.
Tar steel of 16 mm diameter, you can find this notation in Bar Bending Schedule (BBS) and steel detailing..
They r the same. There is no difference.
No. Who do you think you are asking?
program, guide, schedule, course, journey, outline, path, tour, way
700 club broadcasting schedule can be found on CBN website. it has the whole schedule of the program.
Schedule 160 is thicker than 80
A targetted program is a schedule or task the has been put up for judgement.
The 'cron' program is a periodic scheduler program. It starts a process or task on a schedule at 1 minute intervals. It is used to schedule something to start at a particular time and date, or on a periodic basis.
Schedule is when something happens and procedure is what gets done.
The difference between schedule 40 and 80 pvc is the wall thickness and schedule 80 is thicker then schedule 40 so the higher the schedule number the thicker the wall of the pipe thus can hold more pressure.
HBO determines its programming by the length of the program and rating of the program.
Annexure provides a list of documents and is a part of schedule and schedule provides the reference and description of the documents
program schedule
Program schedule.